02.12.2012 Views

Final Report - Asian Development Bank

Final Report - Asian Development Bank

Final Report - Asian Development Bank

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TA 4721-PRC: Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management Project<br />

<strong>Final</strong> <strong>Report</strong> Appendix 13<br />

ANNEX ONE: ESTIMATES OF WEIGHTED AVERAGE COST CAPITAL (WACC)<br />

Weighted Average Cost of<br />

Capital ADB Loan<br />

SARC<br />

Domestic<br />

Loans<br />

Government<br />

Funds<br />

Domestic<br />

Equity WACC<br />

Weighting 35% 65%<br />

Nominal Cost 7.00% 10.00%<br />

Tax Rate 25% 0.00%<br />

Tax Adjusted Nominal Cost 5.250% 10.000%<br />

Inflation Rate 1.90% 3.00%<br />

Real Cost of Capital 3.29% 6.80%<br />

Weighted Component of WACC 1.15% 4.42% 5.57%<br />

Qinling Botanical Garden<br />

Weighting 40% 10% 40% 10%<br />

Nominal Cost 7.00% 9% 10.00% 15%<br />

Tax Rate 25% 25% 0.00% 0.00%<br />

Tax Adjusted Nominal Cost 5.250% 6.750% 10.000% 15.000%<br />

Inflation Rate 1.90% 3.00% 3.00% 3.00%<br />

Real Cost of Capital 3.29% 3.64% 6.80% 11.65%<br />

Weighted Component of WACC 1.32% 0.36% 2.72% 1.17% 5.56%<br />

Hot Springs <strong>Development</strong><br />

Weighting 20% 40% 40%<br />

Nominal Cost 7.00% 9% 15%<br />

Tax Rate 25% 25% 0.00%<br />

Tax Adjusted Nominal Cost 5.250% 6.750% 15.000%<br />

Inflation Rate 1.90% 3.00% 3.00%<br />

Real Cost of Capital 3.29% 3.64% 11.65%<br />

Weighted Component of WACC 0.66% 1.46% 4.66% 6.77%<br />

25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!