TA 4721-PRC: Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management Project<br />

<strong>Final</strong> <strong>Report</strong> Appendix 16<br />

Table 10 Income forecast table after the project completion (Unit: RMB10000 �����<br />

Year 2011 2015 2020 2025<br />

Gross income annually 8, 634.00 9, 345.72 10, 573.82 11, 963.31<br />

Total cost evaluation 5, 473.19 5, 148.05 4, 874.29 4, 639.89<br />

Annual profit<br />

(Feasibility Study)<br />

3, 160.81 4, 193.67 5, 699.53 7, 323.42<br />

PPTA Revenue 3,706 6,405 8,992 11,579<br />

PPTA NCF (Before Tax) - 9,140 2,492 5,220 7,956<br />

Note: The gross income annually consists of the income from ticket, food service, various facilities<br />

service, etc. The visitors consume RMB143.92 Yuan once on average.<br />

41. Therefore, the income of land affected households falls into two parts after the construction of<br />

Qinling National Botanical Garden: One is the annual fixed distribute bonus of RMB 400 Yuan/mu on<br />

average; the other is land sharing distributed income based on the profit of the Garden. And both of<br />

these two kinds of income greatly increase the income of farmers enjoying land share once the project<br />

is implemented. In 2011, the project will come into operation. The income will increase 83% or so than<br />

that prior to the project construction so as to greatly improve the farmers’ living standard in the project<br />

area.<br />

42. According to investigation, after participating of the farmland, the fixed profit sharing can<br />

increase the income of every farmer by 37.39%. If analyzing according to research report of feasibility,<br />

all the participating land of households in Dianzhen Village takes up about 6% of the total investment<br />

of Mt. Qinling National Botanical Garden and the operation profit sharing will be much higher than the<br />

existing income. See Table 9.<br />

4. Distribution and Surveillance of Village-level Land Compensation Fee<br />

43. Land compensation fee and relocation subsidy due to the Project shall be allocated to the<br />

lower level institutions by the construction unit through formal channels. According to Land<br />

Administration Law, the land compensation fee is directed at the owners and entitled users, whereas<br />

relocation subsidy shall be mainly used for the relocation of the agriculture residents after land<br />

expropriation. Therefore, land compensation fee shall be disposed by the village committee, while<br />

relocation subsidy shall be disposed by people who are in charge of the relocation work of the<br />

agriculture residents. If the affected people want to initiate their own business or dispose the money by<br />

themselves, the relocation subsidy shall be given to the affected people. No one shall intercept and<br />

embezzle the land compensation fee and the relocation subsidy.<br />

5. Measures of Restoring the Economy<br />

44. The most important point of the demolition and relocation plan for land expropriation of this<br />

Project is the appropriate reallocation of the land, assisted by other measures of restoring economy.<br />

45. According to relevant laws of the country, the land required by the Project, the demolished<br />

houses and the ground attachment shall be compensated by the construction unit.<br />

H. Implementation of the Plan<br />

46. The land expropriation and relocation work will start from _____ (month), ____ (year), and<br />

shall be finished one month earlier before the construction. The plan can be undertaken in three<br />

phases: first phase, preparation; second phase, implementation; third phase,<br />

examination/supervision/assessment (the external and internal supervision will run throughout the<br />

whole process of the construction).