13.07.2015 Views

Brown Field Municipal Airport Land Use Compatibility Plan

Brown Field Municipal Airport Land Use Compatibility Plan

Brown Field Municipal Airport Land Use Compatibility Plan

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHAPTER 3BROWN FIELD MUNICIPAL AIRPORT POLICIES AND MAPSTable III-2Safety <strong>Compatibility</strong> Criteria<strong>Land</strong> <strong>Use</strong> Types / Typical <strong>Use</strong>s• Multiple land use categories and compatibilitycriteria may apply to a project• See Policy 3-4.7 for limits on ancillary uses 1(People/Gross Acre – sitewide average)Nonresidential developmentIntensity with RiskReduction Policy Objectives(People/Gross Acre – sitewide average)Nonresidential development 3Maximum Lot Coverage(Bldg footprint/site size)Applicable to all conditional developmentTransportation, Communication, and Utilities<strong>Airport</strong> TerminalsSafety ZoneCBCGroup 1 2 3 4 5 6*Maximum Intensity2 0 70 130 130 200n/a 105 260 260 400NolimitNolimit0% 50% 60% 70% 70% 100%Criteria for Conditional(yellow) <strong>Use</strong>s• Maximum Intensity and Lot Coveragelimits apply to all Conditional uses 4• Numbers below refer to zones inwhich condition specified isapplicable• Numbers in yellow cells are Floor AreaRatios for indicated uses 4A-2.1Transportation Terminals: rail, bus, marineA-2.15: Allowed only if associated with airportaccessSee Policy 3.4.5(v)Truck Terminals; Truck Storage A-3Small Transportation Hubs: bus stops —Aircraft Storage S-5 1: Not allowed in Object Free Area **Automobile Parking Structures U-1Automobile Parking Surface Lots — 1: Not allowed in Object Free Area **Street, Highway Rights-of-Way — 1: Not allowed in Object Free Area **Railroads, Public Transit Lines — 1: Not allowed in Object Free Area **Power <strong>Plan</strong>ts —Electrical SubstationsEmergency Communications Facilities —Cell Phone Towers, Wind Turbines U-23, 4, 6: No new sites or land acquisition;modification, replacement, expansion offacilities on existing sites allowed6: Peaker plants allowedSee Policy 3.4.6(c)(3)2 - 6: No new sites or land acquisition;modification, replacement, expansion offacilities on existing sites allowedSee Policy 3.4.6(c)(2)3-55<strong>Brown</strong> <strong>Field</strong> <strong>Municipal</strong> <strong>Airport</strong> <strong>Land</strong> <strong>Use</strong> <strong>Compatibility</strong> <strong>Plan</strong>January 25, 2010 Amended December 20, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!