13.07.2015 Views

Brown Field Municipal Airport Land Use Compatibility Plan

Brown Field Municipal Airport Land Use Compatibility Plan

Brown Field Municipal Airport Land Use Compatibility Plan

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHAPTER 2AIRPORT LAND USE COMMISSION POLICIES(c) Find the project inconsistent with this <strong>Compatibility</strong> <strong>Plan</strong>. In making a finding ofinconsistency, the ALUC shall note the specific conflicts on which it based itsdetermination of inconsistency.2.10.2 Response Time: In responding to land use actions other than general plans submitted for review,the policy of the ALUC is that:(a) Reviews of projects forwarded to the ALUC for a consistency determination shall becompleted within 60 days of the date of “project submittal,” as defined in Paragraph (b)below. This response period does not begin until a complete application and allinformation necessary for accomplishment of the project review have been submitted to theALUC (Pub. Util. Code §21675.2(a) and 21676(d)).(b) The date of “project submittal” shall be the date on which all applicable project submittalinformation, as listed in Policy 2.7.2, is received by the ALUC staff and the ALUC staff hasdetermined the application to be complete (also see Policy 2.3.2). Not later than 30calendar days after the ALUC has received an application, the ALUC staff shall determinein writing whether the application is complete and shall immediately transmit thedetermination to the local agency. If the written determination of completeness of theapplication is not made within 30 days after receipt of the application, and the applicationincludes a statement that it is an application for a consistency determination, theapplication shall be determined complete. Upon receipt of any resubmittal of theapplication, a new 30-day period shall begin, during which the ALUC staff shall determinethe completeness of the application. If the application is determined not to be complete, theALUC staff’s determination shall specify those parts of the application that are incompleteand indicate the manner in which the application can be made complete by providing a listand thorough description of the specific information needed to complete the application fora determination of consistency.(c) If the ALUC fails to make a determination within 60 days after ALUC staff has determinedthe application to be complete, the proposed land use action shall be deemed consistentwith this <strong>Compatibility</strong> <strong>Plan</strong> unless the local agency agrees in writing to an extensionbeyond 60 days or so states at an ALUC public hearing on the action.(d) Regardless of any action or failure to act on the part of the ALUC, the proposed land useaction still must comply with other applicable local, state, and federal laws andregulations.(e) The local agency shall be notified of the ALUC’s determination in writing.2–22<strong>Brown</strong> <strong>Field</strong> <strong>Municipal</strong> <strong>Airport</strong> <strong>Land</strong> <strong>Use</strong> <strong>Compatibility</strong> <strong>Plan</strong>January 25, 2010 Amended December 20, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!