13.07.2015 Views

Brown Field Municipal Airport Land Use Compatibility Plan

Brown Field Municipal Airport Land Use Compatibility Plan

Brown Field Municipal Airport Land Use Compatibility Plan

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHAPTER 2AIRPORT LAND USE COMMISSION POLICIESof the specific information needed to complete the application for a determination ofconsistency.(3) If the written response as to the completeness of the application is not made by theALUC within 30 calendar days after receipt of the consistency application, and/or afterreceipt of any additional information requested, the project will be evaluated using thecompatibility plan in effect on the date of expiration of the 30 calendar day time limit fordetermining completeness of the application materials submitted.(4) Nothing in this policy precludes a local agency and the ALUC from mutually agreeing,with the concurrence of the project applicant, to an extension of any time limit providedby this policy.(d) Subsequent Review of Project(s) Found Consistent: A project previously reviewed by theALUC and found to be consistent with the compatibility plan in effect at the time of theproject review shall not be subject to further review under a subsequently adoptedcompatibility plan unless the project changes in a substantive manner at any point—asdetermined by the local agency or by the ALUC when the ALUC concludes that furtherreview is warranted based on criteria provided in Policy 2.10.4(b)—that potentially wouldinvalidate the original ALUC consistency findings.(1) Any project requiring subsequent ALUC review will be evaluated using the compatibilityplan in effect at the time the resubmittal was deemed complete by the local agencyunless the ALUC determines that such resubmittal lacks one or more of the componentsrequired in Policy 2.7.2. In this case, the project will be evaluated in accordance withParagraphs 2.3.2 (c)(2) through (c)(4), inclusive, above.(2) Any project requiring subsequent ALUC review need not be resubmitted for ALUCreview if prior to resubmittal the general plan of the local agency in which the project issituated has been reviewed by the ALUC and found to be consistent with this<strong>Compatibility</strong> <strong>Plan</strong> and the revised project is consistent with that ALUC-approvedgeneral plan.(e) ALUC Review Not Required: A project application that was deemed complete by the localagency prior to the effective date of this <strong>Compatibility</strong> <strong>Plan</strong>, and which did not requireALUC review because it was located beyond the boundary of the AIA defined by thecompatibility plan in place at the time the application was deemed complete shall notrequire subsequent ALUC review under this <strong>Compatibility</strong> <strong>Plan</strong> unless the project changesin a substantive manner.(f) Long-Term Project: Except as otherwise provided in Paragraphs (a) through (e) above, along-term project, such as a master plan, large subdivision which consists of severalphases, or functionally comparable discretionary permit or action (“original long-termproject”), and any subsequent discretionary or ministerial implementing permit or action2-9<strong>Brown</strong> <strong>Field</strong> <strong>Municipal</strong> <strong>Airport</strong> <strong>Land</strong> <strong>Use</strong> <strong>Compatibility</strong> <strong>Plan</strong>January 25, 2010 Amended December 20, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!