122 Piling equipment <strong>and</strong> methods<br />

Reinforcing<br />

cage for pile<br />

38 mm (1½��) grout<br />

injection pipe<br />

25 mm (1��) circumferential<br />

bars<br />

Basket fabricated<br />

from 14 mm ( 9 16��)<br />

bars<br />

Bottom plate <strong>and</strong> rubber<br />

sheet perforated<br />

25 mm (1��)<br />

spacer<br />

Rubber or neoprene sheet<br />

Uniform size gravel<br />

Lifting rope<br />

6.4 mm (¼��)<br />

steel plates<br />

Figure 3.37 Preloading cell for compressing loosened soil beneath base of bored piles by grouting<br />

(after Bolognesi <strong>and</strong> Moretto (3.14) ).<br />

lowered to the bottom of the borehole. A flexible metal sheet covers the whole of the underside<br />

of this base plate. A grout injection pipe is connected to the space between the plate <strong>and</strong> the<br />

sheet, <strong>and</strong> a peripheral ring of grout pipes is attached to the reinforcing bars for a predetermined<br />

height above the pile base. All grout pipes are extended to a pump <strong>and</strong> metering unit<br />

at the ground surface. The pile is then concreted. After a waiting period to allow the concrete<br />

to harden a cement grout is injected into the peripheral injection pipes with the object of<br />

bonding the lower part of the pile shaft to the surrounding soil. A further period of a few<br />

days is allowed for the grout to harden, then the space between the metal sheet <strong>and</strong> steel<br />

plate is injected with grout under high pressure. The uplift on the steel plate is resisted by<br />

the peripheral grout–soil bond stress on the shaft <strong>and</strong> the soil beneath the flexible sheet is<br />

thus compressed. The height of the peripheral grouting above the pile base depends on the<br />

required base pressure <strong>and</strong> hence on the design base resistance of the pile. The important<br />

control criteria are the grout pressure (a function of the required ultimate pile capacity), an<br />

upward displacement limit to minimize degradation of the side friction, <strong>and</strong> a minimum<br />

grout injection volume to ensure lines are not clogged.<br />

Direct injection of cement grout beneath the pile base was used to re-compress s<strong>and</strong><br />

disturbed by drilling 1.2 m diameter bored piles supporting an office building at Blackwall<br />

Yard, London. Yeats <strong>and</strong> O’Riordan (3.15) described the installation of a 38.2 m deep test pile.<br />

The shaft was drilled by rotary auger under a bentonite slurry through the alluvium <strong>and</strong> stiff<br />

to hard clays of the London Clay <strong>and</strong> Woolwich <strong>and</strong> Reading formation (Lambeth group)<br />

into very dense Thanet S<strong>and</strong>s. The upper 31 m of the shaft were supported by casing. After<br />

completing the drilling four separate grout tube assemblies as shown in Figure 3.38 were<br />

lowered to the base of the borehole. The injection holes in the tubes were sleeved with rubber<br />

(tubes-à-manchette). The pile shafts were then concreted under bentonite, <strong>and</strong> 24 hours after<br />

this water was injected to crack the concrete surrounding the grout tubes. Base grouting<br />

commenced 15 days after concreting. The injections were undertaken in stages with pressures<br />

up to 60 bar <strong>and</strong> frequent checks to ensure the pile head did not lift by more than 1 mm.