298 <strong>Pile</strong> groups under compressive loading<br />

Layer 2 �<br />

Layer 3a �<br />

Layer 3b �<br />

Total � 69 mm<br />

Similarly, for L/B� 10 the uncorrected settlements are<br />

Layer 1 � 19 mm<br />

Layer 2 � 9 mm<br />

Layer 3 � 21 mm<br />

Total � 49 mm<br />

By interpolation the settlement for L/B � 1.3 is 66 mm<br />

Effective overburden pressure at base of raft<br />

From equation 5.36 C1 � 1 � 0.5 �<br />

25<br />

From equation 5.37 C2 � 1 � 0.2lg � 1.48<br />

0.1<br />

Corrected settlement at 25 years � 0.62 � 1.48 � 66 � 61 mm say between<br />

50 <strong>and</strong> 70 mm<br />

214<br />

� 0.62<br />

278<br />

Example 5.4<br />

Nuclear reactors, their containment structures, <strong>and</strong> ancillary units weighing 900 MN are to<br />

be constructed on a base 70�32 m sited on 8 m loose to medium-dense s<strong>and</strong> overlying a<br />

moderately strong s<strong>and</strong>stone. Rotary cored boreholes showed that below a thin zone of weak<br />

weathered rock the RQD value of the s<strong>and</strong>stone was 85% <strong>and</strong> the average unconfined<br />

compression strength was 14 MN/m2 . <strong>Design</strong> a suitable piled foundation <strong>and</strong> calculate the<br />

settlement.<br />

Overall loading on base<br />

278 � 0.36 � 5.2 � 1000<br />

40 � 1 000<br />

278 � 0.46 � 2.5 � 1 000<br />

50 � 1 000<br />

278 � 0.4 � 10.3 � 1000<br />

50 � 1000<br />

� 13 mm<br />

� 6 mm<br />

� 23 mm<br />

� 9.81[(2 � 1.9) � (10 � 0.9) � (10 � 0.9)] � 214 kN/m 2<br />

� 900<br />

70 � 32 � 0.402 MN/m 2<br />

Under this loading the settlement of the s<strong>and</strong> will be excessive. A piled foundation is<br />

required <strong>and</strong> relatively few large-diameter piles will be more economical than a large<br />

number of lightly loaded piles.<br />

Adopt piles 1.5 m in diameter taken 2 m below weak weathered rock on to the moderately<br />

strong s<strong>and</strong>stone. It will be possible to permit loading of the concrete forming the bored