516 Ground investigations, contracts <strong>and</strong> pile testing<br />

While it is essential for the toe level <strong>and</strong> final set of every pile to be recorded, BS EN<br />

12699 does not m<strong>and</strong>ate a full record of sets during driving. There are, however, advantages<br />

in providing a log of the blow count against penetration over the full depth for every pile<br />

driven. If, for example, piles are to be driven to end bearing on a hard stratum it may be<br />

sufficient to record the sets in blows for each 25 mm of penetration after the pile has reached<br />

the hard stratum. On the other h<strong>and</strong>, where piles are supported by shaft friction, say in a<br />

stratum of firm to stiff clay, or in a granular soil overlain by weak soils, it is essential<br />

to record for every pile the level at which the bearing stratum is encountered <strong>and</strong> hence to<br />

check that the required length of shaft to be supported is obtained. For this purpose, the blows<br />

required for each 500 mm or each 250 mm of penetration must be recorded over the full<br />

depth of driving of each pile, until the final metre or so when the sets are recorded in blows<br />

for each 25 mm. Sometimes final sets are recorded as penetration depths for 10 to 25 blows<br />

of the hammer. The advantage of recording the full driving log for piles of every category is<br />

that if troubles arise, such as pile breakage, the records of each pile can be scrutinized, <strong>and</strong><br />

any which show peculiarities can be singled out for special examination or testing.<br />

At the preliminary piling stage the driving records are compared with the ground investigation<br />

data, the static design criteria <strong>and</strong> with the results of loading tests, <strong>and</strong> suitable criteria<br />

regarding final sets for terminating driving are established. If the methods of Chapter 4 have<br />

been used for calculating the penetration depth of friction piles, the depth into the bearing<br />

stratum should, theoretically, be the only criterion, <strong>and</strong> final sets should be irrelevant.<br />

However, because of natural variations in soil properties piles with identical lengths in the<br />

bearing stratum will not necessarily have identical ultimate loads. By driving to a minimum<br />

depth into the bearing stratum <strong>and</strong> to a constant final set (or to within a specified range<br />

of set) the variations in the soil properties can be accommodated.<br />

A minimum penetration is necessary because r<strong>and</strong>om compact layers in the soil may<br />

result in localized areas of high driving resistance. The driving records within these layers<br />

should be compared with the ground investigation data, so that suitable termination levels can<br />

be established. The establishment of criteria for controlling the termination of piles driven<br />

into layered soils is described in Section 4.5.<br />

It is advisable to conduct re-driving tests on preliminary piles, <strong>and</strong> on r<strong>and</strong>om working<br />

piles. These tests are a check on the effects of heave <strong>and</strong> on possible weakening in resistance<br />

due to pore pressure changes. Re-driving can commence within a few hours in the case of<br />

granular soils, after 12 hours for silts, <strong>and</strong> after 24 hours or more for clays. If the re-driving<br />

shows a reduction in resistance after about 20 blows, driving should continue until the<br />

original final set is regained.<br />

Diagrams of the driving <strong>and</strong> re-driving tests should be made for the preliminary piles, <strong>and</strong><br />

compared with the borehole records <strong>and</strong> with in-situ <strong>and</strong> laboratory test data.<br />

The temporary compression at various intervals of pile driving is irrelevant if working<br />

loads have been obtained by the methods described in Chapter 4. However, if dynamic<br />

formulae are adopted the temporary compression values must be taken at intervals after the<br />

pile enters the bearing stratum. The values are obtained by securing a sheet of graph paper<br />

to the pile by adhesive tape. A straight-edge is held horizontally close to the pile <strong>and</strong> using<br />

the straight-edge a pencil line is drawn across the paper during the impact of the hammer<br />

(Figure 11.5a). The pattern of the pencil line is shown in Figure 11.5b from which the<br />

temporary compression is measured.<br />

Other items to be recorded include any obstructions to driving or damage to the pile<br />

<strong>and</strong> deviations in alignment which might indicate breakage below the ground surface.<br />

Methods of checking the alignment of steel tubular <strong>and</strong> H-piles are described in Section 2.2.4.