Critical section for shear check Critical section for flexure check<br />

X9 X9<br />

Y<br />

Structural design of piles <strong>and</strong> pile groups 391<br />

0.2 � pile width or diameter<br />

Figure 7.12 Calculation of bending moments <strong>and</strong> shearing forces on rectangular pile cap.<br />

The bending moments on the pile cap are assumed to act from the centre of the pile to the<br />

face of the nearest column or column stem (Figure 7.12). When calculating bending<br />

moments an allowance should be made for deviations in the positions of the pile heads, up<br />

to the specified maximum tolerance (see Section 3.4.12).<br />

In all cases the aim should be to preassemble reinforcement cages for pile caps <strong>and</strong><br />

ground beams in order to avoid difficulties for steel fixers working in confined conditions<br />

in pits <strong>and</strong> trenches.<br />

The cover to all reinforcement depends on the exposure condition, <strong>and</strong> the grade of<br />

concrete being used in the pile cap, <strong>and</strong> reference should be made to Clause 4 of EC2 <strong>and</strong><br />

Clause 3.3 of BS 8110: Part 1. In particular, where concrete is cast directly against the earth,<br />

the cover should not be less than 75 mm.<br />

Where columns carry a compressive load combined with a unidirectional bending<br />

moment, the line of action of the column load should be made to coincide with the centroid<br />

of the pile group in order to obtain a uniform distribution of load on the piles.<br />

The dimensions of a number of st<strong>and</strong>ardized types of cap for use in design using<br />

computer programs are shown in Figure 7.13.<br />

Deep pile caps are desirable for providing the stiffness necessary to distribute heavy<br />

concentrated column loads on to a large pile cluster. However, this can sometimes cause<br />

construction difficulties in unstable soils where the groundwater level is at a shallow depth<br />

below the ground surface. It is desirable, on the grounds of cost, to avoid construction<br />

expedients such as a wellpoint groundwater lowering system to enable the pile cap to be<br />

constructed in dry conditions. Consideration should therefore be given to raising the level<br />

of the pile cap to bring it above groundwater level or to such a level that sump pumping from<br />

an open excavation will not cause instability by upward seepage.<br />

The design <strong>and</strong> construction of pile caps at over-water locations is discussed in Section 9.6.3.<br />