Depth of h(m)<br />

Segment<br />

(m bql)<br />

� h<br />

�0.38<br />

R *�<br />

� �� vo<br />

p o � 0.13<br />

Resistance of piles to compressive loads 235<br />

17–16 0.5 0.599 1.055 9.5 0.174 0.087 0.250<br />

16–15 1.5 0.395 1.047 8.9 0.107 0.053 0.152<br />

15–14 2.5 0.325 1.037 8.4 0.082 0.041 0.118<br />

14–13 3.5 0.286 1.026 7.9 0.067 0.033 0.095<br />

13–12 4.5 0.260 1.015 7.4 0.057 0.028 0.080<br />

12–11 5.5 0.241 1.003 6.8 0.048 0.024 0.069<br />

11–10 6.5 0.226 0.989 6.3 0.041 0.020 0.057<br />

10–9 7.5 0.214 0.974 5.8 0.035 0.017 0.049<br />

9–8 8.5 0.204 0.958 5.2 0.029 0.015 0.043<br />

8–6.5 7.25 0.217 0.935 4.4 0.026 0.013 0.037<br />

Total Qs � 0.95 MN<br />

Calculating the base resistance, q c at base � 9.7 MN/m 2 D inner/D CPT � 0.438/0.036 � 12.2<br />

which is less than 0.83 � 9.7 � 10 3 /100 � 80.5. Therefore a rigid basal plug will develop.<br />

From equation 4.35, q b � 9.7(0.5 � 0.25 log 914/36) � 1.45 MN/m 2 which is not less<br />

than 0.15q c. Therefore Q b � 1.45 � 0.656 � 0.95 MN, which is less than that of the<br />

unplugged pile (Q b � 9.7 � 0.1046 � 1.01 MN.<br />

Total pile resistance � 0.95 � 1.01 � 1.96 MN<br />

Example 4.7<br />

A bored <strong>and</strong> cast-in-place pile is required to carry a working load of 9000 kN at a site where<br />

4 m of loose s<strong>and</strong> overlies a weak jointed cemented mudstone. Core drilling into the<br />

mudstone showed partly open joints <strong>and</strong> RQD values increased from an average of 15% at<br />

rockhead to 35% at a depth of 10 m. Tests on rock cores gave an average unconfined<br />

compression strength of 4.5 MN/m2 . Determine the required depth of the pile below rockhead<br />

<strong>and</strong> calculate the settlement of the pile at the working load.<br />

The stress on the shaft of a 1.5 m pile is<br />

(MN/m 2 )<br />

9<br />

� 5.1 MN/m2<br />

2 (��4) � 1.5<br />

This is satisfactory for concrete with a cube crushing strength of 25 MN/m2 (allowable<br />

stress � 6 MN/m2 ).<br />

Load carried in shaft friction in the loose s<strong>and</strong> will be negligible.<br />

From Figure 4.33 for quc � 4.5 MN/m The mass factor, j, for RQD from 15%<br />

2 , � � 0.2.<br />

to 35% is 0.2. Therefore, �, from Figure 4.34 is 0.65.<br />

From equation 4.44, rock socket shaft friction � 0.2 � 0.65 � 4500<br />

� 585 kN/m2 Taking a 7 m socket length, ultimate shaft friction � 585 � �1.5 � 7 � 19297 kN<br />

Therefore, factor of safety on shaft friction � 19297<br />

�<br />

� 2.1<br />

9000<br />

(MN/m2 ��rc )<br />

(MN/m 2 �f �<br />

�� rc tan �cv )<br />

Q s (MN)<br />

Because of the open joints in the rock it will be advisable to assume that the base<br />

resistance does not exceed the unconfined compression strength of the rock.<br />

q c