25.12.2012 Views

Pile Design and Construction Practice, Fifth edition

Pile Design and Construction Practice, Fifth edition

Pile Design and Construction Practice, Fifth edition

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ground investigation 498<br />

ground investigations for piling 512;<br />

offshore 508<br />

groundwater: concreting under 62, 121, 133;<br />

observations of 480, 500, 507<br />

groups of piles: block failure of 264, 272;<br />

eccentric loading on 284, 353–6; in filled<br />

ground 276–8; heave effects on 278–80;<br />

lateral loads on 353–6; negative skin friction<br />

on 276–8; optimization of settlements in<br />

287; in rock 272–6; settlement of 250–71; in<br />

soils 240–71; ultimate resistance of 243–50<br />

grouting: base 121; shaft 121<br />

guides, for piling 79, 419<br />

H-section piles: advantages of 39; curvature of<br />

43; for machinery foundations 436; Peine<br />

38, 43; in permafrost 452; shaft friction on<br />

158, 172; strengthening toes of 47; for<br />

underpinning 438–9, 443; wings for 41<br />

hammers: piling 80; vibrators 92–5<br />

heave, ground 276–80, 513<br />

helical piles 445<br />

helmets 100<br />

Hercules piles 32<br />

high-alumina cement 452, 490<br />

Hoesch piles 38, 43<br />

horizontal load see lateral loads<br />

hush piling 99<br />

hydraulic hammers 82–7<br />

ice forces 414–16<br />

ICP method 181–6<br />

impact forces 400, 411<br />

inclination factor 247<br />

inclined loading 248, 355<br />

integrity, structural 535<br />

integrity tests 63, 535<br />

interaction analysis 217, 278<br />

interface friction 139, 169, 184<br />

jacket structures 37, 71, 341, 411, 421<br />

jacking piles 33, 66, 441<br />

jetties see marine structures<br />

jetting piles 101, 125<br />

karst 272<br />

kelly 114<br />

Krupp piles 38<br />

laboratory testing 302<br />

l<strong>and</strong>fill 62<br />

lateral load tests 533–5<br />

lateral loads: from bridge abutments 354–6; on<br />

pile groups 353–6; on raking piles 352–3; on<br />

single piles 327–52<br />

leaders 72–6; spotter 76<br />

Subject index 549<br />

limit states 5, 143<br />

load/settlement curves 520, 528<br />

load transfer: in pile groups 9, 241; on pile<br />

shafts 141, 196, 287<br />

load/uplift curves 532<br />

loading tests: compression 520, 529; constant<br />

rate of penetration 520; continuous rate of<br />

uplift 530; dynamic 527; lateral 533;<br />

maintained load 520; SIMBAT 527;<br />

Statnamic 527; uplift 530<br />

loss of ground due to piling 9, 280, 444,<br />

454, 513<br />

machinery foundations 434–6<br />

made ground see filled ground<br />

maintained load test 520<br />

marine structures: current forces on 411–12;<br />

durability of piles in 482–6; ice forces on<br />

414–15; impact forces on 400–7; mooring<br />

forces on 407; wave forces on 408–11; wind<br />

forces on 411<br />

mass factor 206–8<br />

Ménard pressuremeter 346, 505<br />

micropiles 55<br />

mining subsidence 445–9<br />

minipiles see micropiles<br />

model factor 149<br />

model pile 146, 310<br />

modulus: deformation, of coarse-grained soils<br />

183, 270; deformation, of rocks 273–5;<br />

pressuremeter 346, 348; of subgrade reaction<br />

329, 340, 345, 347; of subgrade variation<br />

341–5<br />

Monopile 82, 418<br />

Monotube piles 43<br />

mooring dolphins 407, 420<br />

mooring forces 407<br />

MV piles 39<br />

NEC3 see Engineering <strong>and</strong> <strong>Construction</strong><br />

Contract<br />

negative skin friction 212–19, 276–8<br />

noise control 97–9, 326, 513<br />

observational method 14, 144–5<br />

open-end piles, resistance of 156, 167–9,<br />

174, 183<br />

organic acids 486–7, 490<br />

organic coatings 495–6<br />

oscillation of piles 37, 412, 466, 534<br />

oscillators, casing 111–14<br />

Oslo point 27, 45<br />

over-consolidated soils 170, 260–2, 265<br />

p–y curves 342–5<br />

packing 18, 96, 100–1, 125, 380–1<br />

painting 495–6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!