Piling equipment <strong>and</strong> methods 73<br />

A range of rigs (with leader extensions as available) are shown in the following table:<br />

Maker Type Usable leader Maximum Capacity pile<br />

length capacity (pile winch<br />

(m) plus hammer) (tonne)<br />

(tonne)<br />

ABI ‘Mobilram’ a TM13/16 15.7 9 5<br />

(Germany) TM14/17V 16.7 10 5<br />

TM16/20 19.7 9 5<br />

TM18/22B 21.4 9 5<br />

Banut 555 15.0 6 10<br />

(Germany) 650 18.6 16 10<br />

Junttan b PM16 15.0 12.0 5<br />

(Finl<strong>and</strong>) PM20 13.8 13.0 8<br />

PM20C 12.6 16.0 10<br />

PM23 12.6 14.0 8<br />

PM25 12.6 18.0 10<br />

Liebherr LRB 125 12.5 12.0 5<br />

(Austria) LRB155 24.0 15.0 8<br />

LRB 255 30.0 30.0 20<br />

LRB 400 42.0 40.0 30<br />

LRH 200 c 40.0 20.0 25<br />

LRH 400 c 48.0 35.0 30<br />

LRH 600 c 60.0 65.0 35<br />

Deiseko-PVE 3015 17.5 8.5 6<br />

(Netherl<strong>and</strong>s <strong>and</strong> 4017 21.8 13.0 6<br />

USA) 5021 24.8 18.0 6<br />

6025 27.2 20.1 10<br />

8027 30.0 30.0 12.5<br />

Notes<br />

a Telescopic mast.<br />

b St<strong>and</strong>ard rigs, additional leader extensions available for pile lengths up to 30 m.<br />

c Using swinging leader.<br />

The ABI Mobilram TM series of telescopic leader masts (Figure 3.1) provide ‘crowd’<br />

(pulldown) for driving piles up to 21 m long using vibratory drivers, but fold down for compact<br />

transport. The Banut 555 <strong>and</strong> 650 piling rigs (Figure 3.2) are not only specially<br />

designed for impact driving, primarily precast concrete piles but are also effective for most<br />

bearing <strong>and</strong> sheet piles. The hydraulic stays attached to the crawler enable forward rakes of<br />

up to 18 o <strong>and</strong> 45 o back rakes, together with lateral movement of up to 14 o available on both<br />

units. The usable length given for the 650 unit relates to the Banut superRAM 6000<br />

hydraulic hammer (see Table 3.2).<br />

The Junttan PM hydraulic piling rigs with fixed leaders can drive piles ranging from 18<br />

to 36 m long (for HHK hydraulic hammers with leader extensions), using hammer rams<br />

from 3000 to 12000 kg. Fore <strong>and</strong> aft rakes of 18 o <strong>and</strong> 40 o respectively <strong>and</strong> lateral raking up<br />

to 12 o are available on the PM25 unit. Liebherr provide fixed leaders mounted on their own<br />

<strong>and</strong> others’ crawler carriages. The LRB series can operate as pile driving rigs <strong>and</strong> rotary<br />

drills for CFA <strong>and</strong> kelly bored piles.