188 Resistance of piles to compressive loads<br />

the same type of soil <strong>and</strong> similar structures with particular reference to local information<br />

(Clauses 7.6.2.3 <strong>and</strong> 1.5.2.2). The overall safety factor for DA1 approach is mainly influenced<br />

by the correlation factors derived from the number of in-situ tests made on the site.<br />

Jardine et al. (4.30) do not offer any recommendations for applying EC7 procedures to their<br />

design methods.<br />

4.3.8 Time effects for piles in coarse-grained soils<br />

The engineer should be aware of a possible reduction in capacity where piles are driven into<br />

fine s<strong>and</strong>s <strong>and</strong> silts. Peck et al. (4.18) stated that ‘If the fine s<strong>and</strong> or silt is dense, it may be<br />

highly resistant to penetration of piles because of the tendency for dilatancy <strong>and</strong> the<br />

development of negative pore pressures during the shearing displacements associated with<br />

insertion of the piles. Analysis of the driving records by means of the wave equation may<br />

indicate high dynamic capacity but instead of freeze, large relaxations may occur.’<br />

An example of this phenomenon was provided by the experiences of driving large diameter<br />

tubular steel piles into dense s<strong>and</strong>y clayey silts for the foundations of the new Galata Bridge<br />

in Istanbul (4.36) . The relaxation in capacity of the 2 m OD piles in terms of blows per 250 mm<br />

penetration is shown in Figure 4.23. The magnitude of the reduction in driving resistance was<br />

not related to the period of time between cessation <strong>and</strong> resumption of driving. It is likely that<br />

most of the reduction occurred within a period of 24 hours after completing a stage of<br />

driving. The widely varying time periods shown in Figure 4.23 were due to the operational<br />

movements of the piling barge from one pile location or group to another.<br />

Correlation of blow count figures with tests made with the dynamic pile analyser<br />

(Section 7.3) showed a markedly smaller reduction in dynamic soil resistance than indicated<br />

by the reduction in blow count after the delay period.<br />

These experiences emphasize the need to make re-driving tests after a minimum period of<br />

24 hours has elapsed after completing the initial drive. Loading tests should not be made on<br />

piles in s<strong>and</strong>s until at least seven days after driving. Where piles are driven into laminated fine<br />

s<strong>and</strong>s, silts <strong>and</strong> clays, special preliminary trial piling should be undertaken to investigate time<br />

effects on driving resistance. These trials should include tests with the pile driving analyser.<br />

Increases in shaft capacity similar to those described above are not expected with<br />

bored piles.<br />

4.4 <strong>Pile</strong>s in soils intermediate between s<strong>and</strong>s <strong>and</strong> clays<br />

Where piles are installed in s<strong>and</strong>y clays or clayey s<strong>and</strong>s which are sufficiently permeable to<br />

allow dissipation of excess pore pressure caused by application of load to the pile, the base<br />

<strong>and</strong> shaft resistance can be calculated for the case of drained loading using equation 4.16.<br />

The angle of shearing resistance used for obtaining the bearing capacity factor Nq should be<br />

the effective angle �� obtained from unconsolidated drained triaxial compression tests. In a<br />

uniform soil deposit, equation 4.16 gives a linear relationship for the increase of base resistance<br />

with depth. Therefore, the base resistance should not exceed the peak value of 11 MN/m2 unless pile loading tests show that higher ultimate values can be obtained. The effective<br />

overburden pressure, ��vo, in equation 4.16 is the total overburden pressure minus the pore<br />

water pressure at the pile toe level. It is important to distinguish between uniform c � �<br />

soils <strong>and</strong> layered c <strong>and</strong> � soils, as sometimes the layering is not detected in a poorly executed<br />

soil investigation.