382 Structural design of piles <strong>and</strong> pile groups<br />

Force/velocity<br />

Time<br />

Force<br />

Velocity<br />

Figure 7.3 Force <strong>and</strong> velocity versus time for hammer blow on pile.<br />

instrument location downwards. Values of soil resistance, quake, <strong>and</strong> damping are assigned<br />

<strong>and</strong> the measured time varying velocity is applied as the boundary condition at the top of<br />

the pile model. The analysis generates a force versus time plot for the instrument location<br />

<strong>and</strong> this is compared with the measured force versus time plot. Adjustments are made to the<br />

values of resistance, quake <strong>and</strong> damping until an acceptable agreement is reached between<br />

computed <strong>and</strong> measured values. At this stage the total soil resistance assigned in the analysis<br />

is taken as the resistance at the time of driving. The latter is a reliable assessment of the static<br />

resistance in soils <strong>and</strong> rocks where time effects are negligible.<br />

The instrumentation described above including the field processing equipment which<br />

produces the force/time plot is a useful method of field control of pile driving in difficult<br />

ground conditions. The shape of the plot (Figure 7.3) can give an indication of a broken pile<br />

<strong>and</strong> a check can be made of the stresses in the pile induced by driving.<br />

When assessing the results of wave equation analyses made at the project planning stage<br />

for the purpose of predicting the capability of a particular hammer to achieve the required<br />

penetration depth, due account should be taken of the effects of time on pile resistance as<br />

discussed in Section 4.3.8. Sufficient reserve of hammer energy should be provided to overcome<br />

the effects of set-up (increase of driving resistance) when redriving a partly driven pile<br />

after a delay period of a few hours or days. If pile driving tests are made at the planning stage<br />

it is helpful to make re-strike tests in conjunction with wave equation analyses at various<br />

time intervals after the initial drive.<br />

Too much reliance should not be placed on immediate readings of the output from the<br />

field processing unit. Rigorous analysis of the data by experienced engineers is required in<br />

conjunction with the appropriate computer programs. Wheeler (7.5) described experiences of<br />

a field trial competition in the Netherl<strong>and</strong>s when a number of firms specializing in dynamic<br />

pile testing were invited to predict the ultimate bearing capacity of four instrumented precast<br />

concrete piles driven through s<strong>and</strong>s <strong>and</strong> silts to penetrations between 11.5 <strong>and</strong> 19 m. A<br />

wide range of predicted capacities was obtained. In the case of one pile the range was 90 to<br />

510 kN compared with a failure load of 340 kN obtained by static testing. Reliable estimates<br />

of ultimate bearing capacity may not be possible if the available hammer has insufficient<br />

energy to overcome the resistance mobilized by the soil against penetration of the pile.<br />

A downward movement of the toe of piles up to about 1 m in diameter of 2.5 mm or<br />

preferably more is required to mobilize sufficient soil resistance to obtain reliable results.