Appendix I. 1: Acti<strong>on</strong> <str<strong>on</strong>g>Plan</str<strong>on</strong>g> for Instituti<strong>on</strong>al Thematic Area<br />
Strategic Goal 1:<br />
To establish viable instituti<strong>on</strong>al arrangements to support integrated resource management in the <str<strong>on</strong>g>Okavango</str<strong>on</strong>g> <str<strong>on</strong>g>Delta</str<strong>on</strong>g> at local, district level, nati<strong>on</strong>al level and internati<strong>on</strong>al (River Basin) level<br />
Strategic Objective 1.1<br />
To establish viable management instituti<strong>on</strong>s for the sustainable management of the <str<strong>on</strong>g>Okavango</str<strong>on</strong>g> <str<strong>on</strong>g>Delta</str<strong>on</strong>g><br />
ID Key issues Operati<strong>on</strong>al Objective Critical Activities Output /<br />
Outcome<br />
I.1.1 There is need to DEA to strengthen the capacity DEA to complete the Full staff<br />
establish a regi<strong>on</strong>al of the ODRS DEA office to recruitment of the compliment<br />
DEA office in ODRS coordinate and m<strong>on</strong>itor<br />
regi<strong>on</strong>al office staff.<br />
and strengthen its<br />
capacity to<br />
coordinate and<br />
m<strong>on</strong>itor the<br />
implementati<strong>on</strong> of<br />
the ODMP.<br />
implementati<strong>on</strong> of the ODMP.<br />
DEA to prepare and<br />
sign a memorandum of<br />
agreement with HOORC<br />
for HOORC to provide<br />
technical support<br />
during ODMP<br />
implementati<strong>on</strong>.<br />
Operati<strong>on</strong>al<br />
Memorandum<br />
of Agreement<br />
I.1.2 There is need to NWDC to strengthen the Assess the capacity of Capacity needs<br />
build the capacity capacity of the communities in communities to manage assessment<br />
of communities for the management and<br />
CBNRM programmes report<br />
delivering<br />
sustainable use of the natural<br />
management and resources. Develop and implement Capacity<br />
sustainable use of<br />
capacity building building<br />
natural resources<br />
programmes<br />
programmes<br />
implemented<br />
I.1.3 Manpower capacity DWNP to improve the<br />
Rati<strong>on</strong>alizati<strong>on</strong> of Additi<strong>on</strong>al<br />
of the fisheries manpower capacity in the DWNP positi<strong>on</strong>s to pers<strong>on</strong>nel (2 at<br />
divisi<strong>on</strong> needs to Fisheries Divisi<strong>on</strong> to sustainably increase capacity of the degree level<br />
be addressed manage the fish resources by Fisheries Divisi<strong>on</strong>. (C1), 2<br />
2012<br />
technical<br />
officers (C2), 6<br />
technical<br />
assistants (B4))<br />
Train existing<br />
rati<strong>on</strong>alized staff<br />
Trained staff<br />
152<br />
Leading Supporting Delivery period Resource needed<br />
Instituti<strong>on</strong> Instituti<strong>on</strong><br />
(Manpower and budget)<br />
DEA March 2007 3 new positi<strong>on</strong>s required<br />
Recurrent/development<br />
DEA HOORC April 2007 DEA to prepare annual<br />
budget for engagement<br />
of HOORC<br />
NWDC<br />
DWNP<br />
DoT, DFRR,<br />
DWNP, DEA,<br />
TLB, Tribal<br />
Admin<br />
March 2007<br />
April 2008-March<br />
2013<br />
March 2007<br />
March 2011<br />
C<strong>on</strong>sultants<br />
Included in the P2 700<br />
000 <strong>on</strong> going<br />
c<strong>on</strong>sultancy<br />
To be determined by<br />
March 2007<br />
Inhouse<br />
Recurrent(<br />
Budget (700 000)