- Page 1 and 2:
i OKAVANGO DELTA MANAGEMENT PLAN PR
- Page 3 and 4:
2.3 ECOLOGICAL AND BIOLOGICAL FEATU
- Page 5 and 6:
5.2.7 FIRE MANAGEMENT .............
- Page 7 and 8: TABLE 3-4: CRITERIA FOR FUTURE PRIO
- Page 9 and 10: Ministry of Environment, Wildlife a
- Page 11 and 12: It stands to reason that the ODMP s
- Page 13 and 14: This chapter describes the strategi
- Page 15 and 16: xiv FRAMP Framework Managem
- Page 17 and 18: OKAVANGO DELTA VISION EXECUTIVE SUM
- Page 19 and 20: physical subsystem. These are often
- Page 21 and 22: Strategic Goal Stategic Objective K
- Page 23 and 24: maintain them it accords prominence
- Page 25 and 26: this, but sectors should continue t
- Page 27 and 28: 1.3 THE NEED FOR A MANAGEMENT PLAN
- Page 29 and 30: Instrument Year Objective Relevance
- Page 31 and 32: Relavant conventions which Botswana
- Page 33 and 34: 1.6.3.1 Project Design Phase Follow
- Page 35 and 36: 1.6.3.5 Final Management</s
- Page 37 and 38: Part of the catchment in Namibia co
- Page 39 and 40: Figure 2-3: The Okavango</s
- Page 41 and 42: 2.1.5.3 Tertiary stakeholders These
- Page 43 and 44: 2.1.6.7. Harry Oppenheimer
- Page 45 and 46: The District Council is responsible
- Page 47 and 48: The district is also affected by a
- Page 49 and 50: which is itself an extension of the
- Page 51 and 52: eastern from the central and wester
- Page 53 and 54: Subsequently, flow from the Thamala
- Page 55 and 56: capacity of these processes to elim
- Page 57: dominated channel fringe and backsw
- Page 61 and 62: Figure 2-10: Distribution map of ra
- Page 63 and 64: zooplankton biomass has been record
- Page 65 and 66: 40 All of the ardeids are primarily
- Page 67 and 68: 15000 in 1988 and 35000 in 2002 (Bo
- Page 69 and 70: Figure 2-11: Spatial Distribution o
- Page 71 and 72: Figure 2-12: Land use map of the OR
- Page 73 and 74: Parks and Game Reserves provide for
- Page 75 and 76: 2.4.3.1 Angola Quantities of water
- Page 77 and 78: Table 2-10: Tourism Enterprise Lice
- Page 79 and 80: 2.4.6 2.4.6 FISHING The Oka
- Page 81 and 82: 2.4.7.2 Tsodilo Hills World Heritag
- Page 83 and 84: 2.4.8.2 Arable Farming Arable farmi
- Page 85 and 86: can the correct management question
- Page 87 and 88: 2.7 TOTAL ECONOMIC VALUE Total Econ
- Page 89 and 90: household investors after deduction
- Page 91 and 92: Table 2-16: Summary of the annual p
- Page 93 and 94: 2.7.2 INDIRECT USE VALUES In this s
- Page 95 and 96: use value of ecosystems (refs). Thu
- Page 97 and 98: HOORC-UB has developed into a resou
- Page 99 and 100: found in the fringes of the <strong
- Page 101 and 102: natural factors. There are two majo
- Page 103 and 104: However, there are indications that
- Page 105 and 106: molesta as well as of planktonic an
- Page 107 and 108: employed. Cross-border re-invasion
- Page 109 and 110:
and use of the area’s resources,
- Page 111 and 112:
3.7 CRITERIA FOR DETERMINING MANAGE
- Page 113 and 114:
No. Management Are
- Page 115 and 116:
No. Management Are
- Page 117 and 118:
No. Management Are
- Page 119 and 120:
Table 3-2: Priority issues to be ad
- Page 121 and 122:
3.7.2.3 Proposed criteria for futur
- Page 123 and 124:
2 = Moderate social benefits 3 = Lo
- Page 125 and 126:
• clearing of small access channe
- Page 127 and 128:
The overall goal of the ODMP sets t
- Page 129 and 130:
Strategic Objectives • To sustain
- Page 131 and 132:
Strategic Object 1.3: To raise publ
- Page 133 and 134:
4.3.3 SOCIO-ECONOMIC SWOT ANALYSIS
- Page 135 and 136:
Table 4-4: Operational Objectives t
- Page 137 and 138:
THEMATIC AREA: SOCIO-ECONOMIC Strat
- Page 139 and 140:
5.1.1 ESTABLISHMENT OF VIABLE MANAG
- Page 141 and 142:
upstream - downstream interactions
- Page 143 and 144:
photography, birding, sightseeing e
- Page 145 and 146:
The maintance of this delicate bala
- Page 147 and 148:
It also provides for their integrat
- Page 149 and 150:
c) Existing lodges would continue,
- Page 151 and 152:
Table 5-2: Characterization of cond
- Page 153 and 154:
Category Natural / Bio-physical Tou
- Page 155 and 156:
Category Natural / Bio-physical Tou
- Page 157 and 158:
vi. Where vegetation resources are
- Page 159 and 160:
d) There should be adequate equipme
- Page 161 and 162:
implementers are presented in Appen
- Page 163 and 164:
138 District and National Developme
- Page 165 and 166:
Butzer, K. W., 1984. Archeogeology
- Page 167 and 168:
Hancock, P. 2003b. Saddle-billed St
- Page 169 and 170:
McCarthy, T.S., W.N. Ellery and A.
- Page 171 and 172:
ODMP, 2006. Slaty Egret Baseline Su
- Page 173 and 174:
simulated SPOT VEGETATION imagery.
- Page 175 and 176:
Tyson, P.D.R. Fuchs, C. Fu, L. Lebe
- Page 177 and 178:
Appendix I. 1: Action Plan<
- Page 179 and 180:
Strategic Goal 1: To establish viab
- Page 181 and 182:
Strategic Goal 1: To establish viab
- Page 183 and 184:
Strategic Goal 2: To ensure the lon
- Page 185 and 186:
Strategic Goal 3: To sustainably us
- Page 187 and 188:
162 APPENDIX II - MONITORING AND EV
- Page 189 and 190:
Strategic Goal 1: To establish viab
- Page 191 and 192:
Strategic Goal 1: To establish viab
- Page 193 and 194:
Appendix II. 2: Plan</stron
- Page 195 and 196:
Appendix II. 3: Plan</stron
- Page 197 and 198:
Strategic Goal 3: To sustainably us
- Page 199 and 200:
Strategic Goal 1: To establish viab
- Page 201 and 202:
Appendix II. 5: Plan</stron
- Page 203 and 204:
Appendix II. 6: Plan</stron
- Page 205 and 206:
180 APPENDIX III: ASSESSING IMPACTS
- Page 207 and 208:
I.1.3 Manpower capacity of the fish
- Page 209 and 210:
Strategic Goal 1: To establish viab
- Page 211 and 212:
Appendix III. 2: Assessing Impacts
- Page 213 and 214:
B.2.4 The risk of Tsetse re-infesta
- Page 215 and 216:
Strategic Goal 3: To sustainably us