Okavango Delta Management Plan - Ramsar Convention on Wetlands
Okavango Delta Management Plan - Ramsar Convention on Wetlands
Okavango Delta Management Plan - Ramsar Convention on Wetlands
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
187<br />
be protected. implementati<strong>on</strong> Enhancement of<br />
ecological<br />
the ODRS<br />
status of<br />
Impacts related to<br />
increased number of<br />
tourists<br />
B.1.5 The inadequacy of base<br />
line data <strong>on</strong> fish stocks<br />
in the ODRS needs to be<br />
addressed.<br />
DWNP to develop and<br />
implement fish stock<br />
m<strong>on</strong>itoring programme<br />
Undertake regular fish<br />
m<strong>on</strong>itoring surveys and collect<br />
catch data from fishers<br />
Improved knowledge<br />
<strong>on</strong> the fish stocks opf<br />
the ODRS<br />
should be developed<br />
Data collected should be<br />
periodically made<br />
available to natural<br />
resource managers to<br />
improve knowledge and<br />
initiate review of<br />
management systems<br />
Strategic Goal 2:<br />
To ensure the l<strong>on</strong>g-term c<strong>on</strong>servati<strong>on</strong> of the <str<strong>on</strong>g>Okavango</str<strong>on</strong>g> <str<strong>on</strong>g>Delta</str<strong>on</strong>g> and the provisi<strong>on</strong> of existing ecosystem services for the benefit of all the organisms depending <strong>on</strong> it<br />
Strategic Objective 2.2:<br />
To maintain or restore the wetland habitats and ecosystems of the <str<strong>on</strong>g>Okavango</str<strong>on</strong>g> <str<strong>on</strong>g>Delta</str<strong>on</strong>g><br />
ID Key Issues Operati<strong>on</strong>al<br />
Critical Activities Potential impact Mitigati<strong>on</strong> measure Sustainable criteria<br />
Objectives<br />
B.2.1 There is need to<br />
reduce the impact<br />
and frequency of<br />
unc<strong>on</strong>trolled veld<br />
fires.<br />
B.2.2 Limited knowledge<br />
<strong>on</strong> the impact of<br />
large herbivores <strong>on</strong><br />
sensitive habitats<br />
B.2.3 Overgrazing by<br />
livestock needs to<br />
be addressed<br />
DFRR to reduce the<br />
impact and frequency<br />
of unc<strong>on</strong>trolled veld<br />
fires.<br />
DWNP to assess and<br />
mitigate the impact of<br />
large herbivores <strong>on</strong><br />
sensitive habitats<br />
DAHP to reduce<br />
overgrazing in the<br />
ODRS<br />
Implement the guidelines relevant<br />
<strong>on</strong> appropriate fire management<br />
practices as c<strong>on</strong>tained in the Fire<br />
<str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>Plan</str<strong>on</strong>g><br />
Assess the extent of the impact of<br />
large herbivores <strong>on</strong> sensitive<br />
habitats<br />
Develop limits of acceptable<br />
change for sensitive habitats in<br />
the Moremi Game Reserve<br />
M<strong>on</strong>itor defined parameters to<br />
ensure limits are not exceeded<br />
and institute corrective measures<br />
Carry out biomass assessment<br />
Develop and implement the range<br />
carrying capacities<br />
Reducti<strong>on</strong> in the negative<br />
impacts of unc<strong>on</strong>trolled fires<br />
in the ecosystem<br />
Some secti<strong>on</strong>s of the society<br />
may not be aware of the<br />
existing guidelines of use of<br />
fire<br />
Improved knowledge <strong>on</strong> the<br />
impacts of herbivores <strong>on</strong><br />
sensitive envir<strong>on</strong>ments<br />
Improved rangeland<br />
management<br />
Resistance from farmers <strong>on</strong><br />
proposed strategies<br />
Implement the ODRS<br />
Fire <str<strong>on</strong>g>Management</str<strong>on</strong>g><br />
Strategy<br />
Wide c<strong>on</strong>sultati<strong>on</strong> and<br />
communicati<strong>on</strong> of the<br />
strategy<br />
Implementati<strong>on</strong> of<br />
elements of the<br />
Research Strategy and<br />
M<strong>on</strong>itoring Acti<strong>on</strong> <str<strong>on</strong>g>Plan</str<strong>on</strong>g><br />
Adequate<br />
communicati<strong>on</strong> with<br />
farmers before<br />
implementing rangeland<br />
carrying capacities<br />
Develop alternative<br />
livelihoods systems<br />
Mechanisms which<br />
Develop feedback mechanisms<br />
to improve guidelines/fire<br />
management strategy<br />
Sound scientific methods for<br />
c<strong>on</strong>ducting research to have<br />
reliable results<br />
Implementati<strong>on</strong> of carrying<br />
capacities should be guided by<br />
the provisi<strong>on</strong> of alternative<br />
livelihood systems which are<br />
sustainable<br />
The programme should be<br />
guided by the objective of<br />
reducing poverty levels