Okavango Delta Management Plan - Ramsar Convention on Wetlands
Okavango Delta Management Plan - Ramsar Convention on Wetlands
Okavango Delta Management Plan - Ramsar Convention on Wetlands
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
I.1.3 Manpower capacity of<br />
the fisheries divisi<strong>on</strong><br />
needs to be<br />
addressed<br />
I.1.4 The solid waste<br />
collecti<strong>on</strong> services<br />
within the ODRS need<br />
to be improved.<br />
I.1.5 The solid and liquid<br />
waste infrastructure<br />
in the ODRS needs to<br />
be improved.<br />
I.1.6 The instituti<strong>on</strong>al<br />
capacity of the district<br />
waste management<br />
needs to be improved<br />
182<br />
DWNP to improve the<br />
manpower capacity in the<br />
Fisheries Divisi<strong>on</strong> to<br />
sustainably manage the fish<br />
resources by 2012<br />
NWDC to improve solid and<br />
liquid waste collecti<strong>on</strong> within<br />
the ODRS<br />
NWDC to improve the solid<br />
and liquid waste<br />
infrastructures in the ODRS<br />
NWDC to improve the<br />
instituti<strong>on</strong>al capacity of the<br />
district waste management.<br />
Rati<strong>on</strong>alizati<strong>on</strong> of DWNP<br />
positi<strong>on</strong>s to increase<br />
capacity of the Fisheries<br />
Divisi<strong>on</strong>.<br />
Train existing rati<strong>on</strong>alized<br />
staff<br />
Engage private sector to<br />
collect and dispose solid<br />
and liquid waste in<br />
settlements<br />
Ensure tour operators<br />
comply with provisi<strong>on</strong>s of<br />
waste management as<br />
c<strong>on</strong>tained in the lease<br />
agreement<br />
Operati<strong>on</strong>alise Maun landfill<br />
site through procurement<br />
and installati<strong>on</strong> of<br />
outstanding equipment<br />
To c<strong>on</strong>struct a landfill site in<br />
Gumare<br />
To increase temporary<br />
storage facilities in all<br />
settlements<br />
Increase operati<strong>on</strong>al<br />
technician staff compliment<br />
from 6 to 8 by rati<strong>on</strong>alising<br />
existing positi<strong>on</strong>s.<br />
livelihoods<br />
Improved management of<br />
the fisheries resources<br />
Staff turn-over may<br />
hamper implementati<strong>on</strong> of<br />
the programmes<br />
• Improved waste<br />
management system<br />
• Poor supervisi<strong>on</strong> and<br />
payment of<br />
c<strong>on</strong>tractors may<br />
result accumulati<strong>on</strong><br />
of waste<br />
Lack of m<strong>on</strong>itoring may<br />
not significantly improve<br />
status<br />
Impacts related to<br />
operati<strong>on</strong> of landfill such<br />
as leachate, gas<br />
emmissi<strong>on</strong>s, smell and air<br />
pollluti<strong>on</strong><br />
Impacts related to<br />
c<strong>on</strong>structi<strong>on</strong> and operati<strong>on</strong><br />
of land fill<br />
Additi<strong>on</strong>al storage facilities<br />
• Improved waste<br />
management<br />
• Increased financial<br />
obligati<strong>on</strong>s<br />
<str<strong>on</strong>g>Plan</str<strong>on</strong>g> for reainig staff<br />
should be put in place<br />
• Adequate financial<br />
resources should<br />
be made available<br />
for waste<br />
management<br />
• Before outsourcing<br />
NWDC should<br />
assess those waste<br />
management<br />
aspects they are<br />
able to adequately<br />
provide to reduce<br />
the financial<br />
burden<br />
EIA to be used to<br />
manage impacts<br />
• Qualified and<br />
skilled pers<strong>on</strong>nel to<br />
be recuited in to<br />
those posts<br />
• Proper incentives to<br />
retain staff<br />
Staffing c<strong>on</strong>diti<strong>on</strong>s should be<br />
guided by strategic goals and<br />
objectives set out by respective<br />
department with regard to<br />
retaining staff<br />
Guidelines developed for the<br />
management should be used at all<br />
times<br />
Waste management practices<br />
should be in accordance with<br />
waste management and sanitati<strong>on</strong><br />
master plan<br />
A clear timetable for m<strong>on</strong>itoring<br />
should be developed to ensure<br />
tour comply with provisi<strong>on</strong>s<br />
Landfill to operate in accordance<br />
with the EIA Act, Waste<br />
<str<strong>on</strong>g>Management</str<strong>on</strong>g> Act and Waste and<br />
Sanitati<strong>on</strong> Master <str<strong>on</strong>g>Plan</str<strong>on</strong>g>.<br />
Well trained and equiped staff