Mainly on the Elbe River - Central Europe
Mainly on the Elbe River - Central Europe
Mainly on the Elbe River - Central Europe
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Picture 37 - CR - Map of <strong>the</strong> railway network with distinguished railway load categories (2008)<br />
Source: SŽDC Network Statement, graphically adjusted by CityPlan, spol. s r. o.<br />
The total costs of RR pricing include expenses for maintenance of RR for operati<strong>on</strong> costs.<br />
The maximum price for cargo transport for using <strong>the</strong> RR in CR (c<strong>on</strong>cerning <strong>the</strong> nati<strong>on</strong>al railway<br />
network included in <strong>the</strong> <strong>Europe</strong>an railway system) 12 :<br />
• Charges for assigned capacity of <strong>the</strong> RR:15 CZK global route / day (i.e. 0,59 EUR),<br />
• Operati<strong>on</strong> of <strong>the</strong> RR: 42,65 CZK / train km (i.e. 1,67 EUR / train km),<br />
• Ensuring ability to operate: 56,51 Kč / 1.000 brutto t<strong>on</strong>s km (i.e. 2,22 EUR / 1.000<br />
brtkm)<br />
12 Source: attachment no. 1 of <strong>the</strong> Price precept of <strong>the</strong> Ministry of Finance no.01/2010<br />
Note: This is <strong>the</strong> maximum rate for electrified corridor railways. The fees for o<strong>the</strong>r railways are lower with <strong>the</strong> excepti<strong>on</strong> of<br />
an idenpendent tracti<strong>on</strong> driving <strong>on</strong> an eletrified.<br />
A feasibility study for “Improvement of C<strong>on</strong>diti<strong>on</strong>s for <strong>the</strong> <strong>River</strong> Transport in <strong>Central</strong> <strong>Europe</strong> (mainly <strong>on</strong> <strong>the</strong> <strong>Elbe</strong><br />
<strong>River</strong>)“ realized within <strong>the</strong> ChemLog project 125