04.02.2013 Views

The MBR Book: Principles and Applications of Membrane

The MBR Book: Principles and Applications of Membrane

The MBR Book: Principles and Applications of Membrane

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TMP (Kpa)<br />

80<br />

70<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

0<br />

0<br />

Sep 29 Oct 19 Nov 8 Nov 28<br />

Date<br />

Dec 18 Jan 7 Jan 27<br />

has been maintained between 8–12 g/L, at an SRT <strong>of</strong> �30 days, regardless <strong>of</strong> feedwater<br />

quality <strong>and</strong> organic loading (0.46–1.5 kg COD/m 3 /day). <strong>The</strong> sludge yield is<br />

around 0.27 kg SS/kg COD. Purification performance by the plant is very satisfactory.<br />

Removals achieved by the <strong>MBR</strong> are 96% COD, 97% TOC, 92% TKN, 71% TN <strong>and</strong><br />

97% BOD5, combined with very low silt density index (SDI) <strong>of</strong> below 2. <strong>The</strong>se values<br />

equate to average values <strong>of</strong> 35.2 mg/L, 20.2 mg/L <strong>and</strong> 6.5 mg/L for permeate COD,<br />

TOC <strong>and</strong> BOD, respectively. <strong>The</strong> RO permeate had a TOC <strong>of</strong> �2 mg/L, satisfying the<br />

stringent requirement for water reclamation.<br />

At capacity, the plant achieves an <strong>MBR</strong> flux <strong>of</strong> 24.5 LMH; the mean net flux is<br />

21.5 LMH, maintained by backwashing for 30 s every 15 min <strong>and</strong> applying a recovery<br />

clean every 3 months with sodium hypochlorite. <strong>The</strong> average TMP is 0.08–0.12 bar,<br />

considerably below the maximum allowable value <strong>of</strong> 0.55 bar, or 55 kPa (Fig. 5.31).<br />

<strong>The</strong> success <strong>of</strong> the Bah-Teh plant has led to other similar effluent treatment plant<br />

being installed or planned. <strong>The</strong> TFT–LCD plant at Longtan, Taoyuan County was<br />

commissioned in May 2003 <strong>and</strong> is designed for a peak flow <strong>of</strong> 4.2 MLD from 20 cassettes<br />

<strong>of</strong> 20 ZeeWeed ® 500c modules in four trains, providing a total membrane<br />

area <strong>of</strong> 8800 m 2 . <strong>The</strong> planned installed capacity for VDU fabrication effluent was<br />

50 MLD by 2005, with a 22.5 MLD plant due for commissioning in May 2006.<br />

Installations include two <strong>MBR</strong>-RO plants, <strong>of</strong> 5 <strong>and</strong> 1.5 MLD capacity commissioned<br />

in 2004 <strong>and</strong> 2005, respectively, which are fitted with anaerobic pretreatment to<br />

contend with the high COD loadings.<br />

5.3.2 Mitsubishi Rayon Engineering<br />

TMP<br />

Flow rate<br />

Maximum membrane TMP<br />

Figure 5.31 TMP <strong>and</strong> pressure transients over winter season, Bah-Teh <strong>MBR</strong> plant<br />

Case studies 245<br />

5.3.2.1 Early Japanese installations<br />

Mitsubishi Rayon has almost as many installed plant in Japan as Kubota. <strong>The</strong> plants<br />

tend to operate at slightly lower fluxes than those <strong>of</strong> many <strong>of</strong> the other <strong>MBR</strong> technologies,<br />

but this is countered to a large extent by the lower cost <strong>of</strong> the membrane.<br />

80<br />

70<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

Flow rate (m 3 /h)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!