- Page 1 and 2:
Risk Management Series Design Guida
- Page 3 and 4:
Any opinions, findings, conclusions
- Page 5 and 6:
This guidance focuses on safe rooms
- Page 7 and 8:
protect occupants until law enforce
- Page 9 and 10:
of best practices (based on current
- Page 11 and 12:
Project Advisory Panel: Ronald Bark
- Page 13 and 14:
1.7.1.1. Tornado.or.Short-term.Shel
- Page 15 and 16:
2.6.6. RM1.and.RM2.Reinforced.Mason
- Page 17 and 18:
4.5. Community.Shelter.Operations.P
- Page 19 and 20:
FIgUREs chapter 1 Figure.1-1.. Terr
- Page 21 and 22:
Figure.2-16.. Spray-on.elastomer.co
- Page 23 and 24:
chapter 4 Figure.4-1.. Preparedness
- Page 25 and 26:
in response to the manmade CBRE thr
- Page 27 and 28:
decides not to chance fate and cons
- Page 29 and 30:
Although operational security measu
- Page 31 and 32:
Table 1-2: Safe Evacuation Distance
- Page 33 and 34:
Figure 1-1 terrorism by event 1980
- Page 35 and 36:
odorless. Their effects occur mainl
- Page 37 and 38:
Figure 1-3 radioactive materials sm
- Page 39 and 40:
Table 1-3: Correlation of ISC Level
- Page 41 and 42:
Table 1-4: ISC CBR Levels of Protec
- Page 43 and 44:
m It is partially shielded by the s
- Page 45 and 46:
m Single-use shelters. Single-use s
- Page 47 and 48:
structure or a new structure to be
- Page 49 and 50:
m Territoriality (promotes a sense
- Page 51 and 52:
Figure 1- examples of internal shel
- Page 53 and 54:
Figure 1-9 examples of internal she
- Page 55 and 56:
loading depending upon the building
- Page 57 and 58:
model building codes all have provi
- Page 59 and 60:
Figure 1-10 national Weather servic
- Page 61 and 62:
operations and maintenance plan. De
- Page 63 and 64:
For tornado shelters, the most crit
- Page 65 and 66:
Reference Standard 6-1 Photolumines
- Page 67 and 68:
every building should have an emerg
- Page 69 and 70:
Three methods are followed for the
- Page 71 and 72:
partitions for areas of about 12,00
- Page 73 and 74:
the 2006 editions of nFPa 101, Life
- Page 75 and 76:
Figure 1-13 operations Zones, casua
- Page 77 and 78:
Figure 1-1 nrP-cis emergency decont
- Page 79 and 80:
Figure 1-1 example of Pentagon stag
- Page 81 and 82:
Figure 1-19 site and evidence colle
- Page 84 and 85:
2.1 OVerVieW Structural deSign crit
- Page 86 and 87:
affect the hazard potential of the
- Page 88 and 89:
2.2.1 Blast effects in low-rise Bui
- Page 90 and 91:
As an example, panelized constructi
- Page 92 and 93:
2.3 hardened cOnStructiOn 2.3.1 Str
- Page 94 and 95:
Protective design further requires
- Page 96 and 97:
deformed, and transfer them to the
- Page 98 and 99:
pressures, such that they overcome
- Page 100 and 101:
façade materials intact and attach
- Page 102 and 103:
2.4 neW cOnStructiOn The design of
- Page 104 and 105:
Blast-resistant detailing requires
- Page 106 and 107:
the slab, the slab reinforcement mu
- Page 108 and 109:
spacing of 16 inches that extends i
- Page 110 and 111:
In order for the glazing to realize
- Page 112 and 113:
precast panels, the spacing of the
- Page 114 and 115:
to a column or a vehicle-borne expl
- Page 116 and 117:
without any means of attachment or
- Page 118 and 119:
polycarbonate glazing can be mixed
- Page 120 and 121:
Rigid catch bar systems were design
- Page 122 and 123:
stainless steel cables connected wi
- Page 124 and 125:
Alternatively, an unreinforced maso
- Page 126 and 127:
Figure 2- 9 Metal stud blast wall I
- Page 128 and 129:
2.5.3 checklist for retrofitting is
- Page 130 and 131:
Shearwalls consist of straight or d
- Page 132 and 133:
Light wood frame structures do not
- Page 134 and 135:
eam column joints, all member stres
- Page 136 and 137:
Steel moment frame structures provi
- Page 138 and 139:
Steel frames with infill masonry wa
- Page 140 and 141:
esponse to 500 pounds of TNT at a s
- Page 142 and 143:
to provide ductile performance. The
- Page 144 and 145:
Unless sited in a seismic zone, con
- Page 146 and 147:
Precast concrete frames and shearwa
- Page 148 and 149:
uilding. Locating the shelter in th
- Page 150 and 151:
Unreinforced load-bearing masonry b
- Page 152 and 153:
damage in response to 500 pounds of
- Page 154 and 155:
Floor slabs within an interior stai
- Page 156 and 157:
3.1 oVeRVieW This chapter describes
- Page 158 and 159:
m Class 2. This class also includes
- Page 160 and 161:
may be necessary for people to occu
- Page 162 and 163:
3.3 SaFe RooM CRiTeRia This section
- Page 164 and 165:
interior room is preferable to a ro
- Page 166 and 167:
m Penetrations. Measures for reduci
- Page 168 and 169:
Figure 3- hinged covers facilitate
- Page 170 and 171:
enclosure subjected to wind and buo
- Page 172 and 173:
Many models of these indoor air pur
- Page 174 and 175:
designing and building ultra-high e
- Page 176 and 177:
Table 3-2: Leakage per Square Foot
- Page 178 and 179:
3.5 opeRaTionS anD MainTenanCe For
- Page 180 and 181:
m Turn on a radio or TV in the safe
- Page 182 and 183:
Tape, plastic, and carbon dioxide d
- Page 184 and 185:
m Isolation dampers. Correct damper
- Page 186 and 187:
3.7 CoMMiSSioninG a CLaSS 1 CBR SaF
- Page 188 and 189:
have been appropriately placed to p
- Page 190 and 191:
m To develop an understanding of th
- Page 192 and 193:
CBR ThReaT pRoTeCTion Figure 3- Tas
- Page 194 and 195:
Task 4. Determine How Much Filtered
- Page 196 and 197:
Pre-heat Coil Module. This module c
- Page 198:
address system or the single-switch
- Page 201 and 202:
the Homeland security digital Libra
- Page 203 and 204: the national Fire Protection associ
- Page 205 and 206: From established reporting mechanis
- Page 207 and 208: An Emergency Operations Center (EOC
- Page 209 and 210: m Weapons of Mass Destruction-Civil
- Page 211 and 212: dHs/FEma and the office for domesti
- Page 213 and 214: The 48 seconds do not include the t
- Page 215 and 216: Figure 4-5 High-rise buildings and
- Page 217 and 218: m In the initial phase (hours and d
- Page 219 and 220: designated. The following is a list
- Page 221 and 222: m Coordinating shelter evacuation p
- Page 223 and 224: 4.5.5 notification manager The Noti
- Page 225 and 226: Table 4-1: Shelter Equipment and Su
- Page 227 and 228: Toilets would be needed by the occu
- Page 229 and 230: 4.5.8.7 Emergency Equipment Credenz
- Page 231 and 232: FEma’s United states Fire adminis
- Page 233 and 234: 4.7.3 event safety procedures The f
- Page 235 and 236: 4.9 training and inFormation Employ
- Page 237 and 238: Bureau of Alcohol, Tobacco, Firearm
- Page 239 and 240: Federal Emergency Management Agency
- Page 241 and 242: Phan, L.T., and Simiu, E. 1998. The
- Page 243 and 244: Army TM 5-853-4, Security Engineeri
- Page 245 and 246: Corps of Engineers Guide Specificat
- Page 247 and 248: Addresses workplace vulnerability t
- Page 249 and 250: State of Florida Shelter Plan, Flor
- Page 251 and 252: Management (2003) http://floridadis
- Page 253: UL 586, High-Efficiency, Particulat
- Page 257 and 258: F FBI Federal Bureau of Investigati
- Page 259 and 260: J JFO Joint Field Office K kb kilob
- Page 261 and 262: O O.C. on center OG outer garments
- Page 263: U UBC Building Code UCRL University