05.04.2013 Views

FEMA 453 Design Guidance for Shelters and Safe Rooms

FEMA 453 Design Guidance for Shelters and Safe Rooms

FEMA 453 Design Guidance for Shelters and Safe Rooms

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 1-19<br />

site <strong>and</strong> evidence<br />

collection on the site<br />

source: arLington county<br />

aFter-action rePort<br />

<strong>Design</strong>ated entry/exit access control points will be between each<br />

of the zones. The entry/exit access control point between the Hot<br />

<strong>and</strong> Warm Zones is used by the first responders in PPE to enter/<br />

exit the Hot Zone <strong>and</strong> extract victims <strong>and</strong> casualties (both contaminated<br />

<strong>and</strong> uncontaminated) to the Warm Zone. The patient<br />

entry/exit access control point between the Warm <strong>and</strong> Cold Zones<br />

is used as a one-way exit out to move decontaminated uninjured<br />

personnel <strong>and</strong> medically stabilized casualties. The first responders<br />

entry/exit between the Cold <strong>and</strong> Warm Zones is used by the first<br />

responders, rapid visualization <strong>and</strong> structural evaluation team,<br />

<strong>and</strong> debris operations personnel to enter <strong>and</strong> exit the site, <strong>and</strong> includes<br />

equipment shown in Figure 1-20.<br />

1- 8 design considerations

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!