<strong>GE</strong> Oil <strong>and</strong> Gas<br />

<strong>SVI</strong> <strong>II</strong> <strong>AP</strong> Instruction Manual<br />

Isolators<br />

Another solution is to use an Intrinsic Safety Isolator for each loop as shown in Figure 67<br />

on page 119. A number of manufacturers make suitable isolators designed for use with<br />

HART output circuits. Using an IS Isolator allows up to three <strong>SVI</strong> <strong>II</strong> <strong>AP</strong> to be operated<br />

from a single 4 - 20 mA DCS output. Each isolator has a low compliance voltage input<br />

requirement <strong>and</strong> a high voltage output capacity.<br />

Up to three isolators can be connected in series to a single controller output <strong>and</strong> each of<br />

them can drive a positioner. Isolators are used to provide compliance voltage <strong>and</strong><br />

isolation even in installations not requiring intrinsic safety. An example of an isolator can<br />

be obtained from R. Stahl, (Model 9318/16-22-10). Consult the manufacturer for detailed<br />

installation instructions.<br />

The HART loop address of each device must be set to 1, 2, <strong>and</strong> 3 (or other non-zero<br />

values) to allow a HART master to recognize each <strong>SVI</strong> <strong>II</strong> <strong>AP</strong> when connected to all three<br />

devices on the safe area side of the multiple isolators. Do not use 0 for any of the<br />

positioners. A 0 causes HART masters to stop searching for additional positioners.<br />