14.11.2013 Views

Masoneilan SVI II AP Installation and Maintenance ... - GE Energy

Masoneilan SVI II AP Installation and Maintenance ... - GE Energy

Masoneilan SVI II AP Installation and Maintenance ... - GE Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>GE</strong> Oil <strong>and</strong> Gas<br />

<strong>SVI</strong> <strong>II</strong> <strong>AP</strong> Instruction Manual<br />

Load Specifications<br />

Recommended Load Specifications<br />

Table 17 lists the operational specifications of the switches. These switches receive 24<br />

VDC on/off signals.<br />

Table 17<br />

Item<br />

Rated Input Voltage (from relay)<br />

Switch Operational Specifications<br />

24 VDC (sink/source)<br />

Specification<br />

Input ON Voltage 18 to 26.4<br />

Input ON Voltage<br />

5.0 V or less<br />

Checking Switch Operation<br />

ValVue Comm<strong>and</strong>s<br />

This procedure is an example, using the settings in Figure 73, to verify switch operation:<br />

1. Click the Configure tab, click <strong>and</strong> Figure 73 appears.<br />

Figure 73<br />

I/O Configure<br />

2. Switch from Normally Opened to Normally Closed or vice versa, click OK <strong>and</strong> Apply.<br />

3. Click the Monitor tab.<br />

4. Select Comm<strong>and</strong> 142 Read Switches from the pulldown list <strong>and</strong> click OK. The<br />

information field below populates with the configured switch states.<br />

5. Ensure that the switch just reconfigured has changed state.<br />

134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!