Masoneilan SVI II AP Installation and Maintenance ... - GE Energy
Masoneilan SVI II AP Installation and Maintenance ... - GE Energy
Masoneilan SVI II AP Installation and Maintenance ... - GE Energy
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>GE</strong> Oil <strong>and</strong> Gas<br />
<strong>SVI</strong> <strong>II</strong> <strong>AP</strong> Instruction Manual<br />
Figure 79<br />
Pneumatic Cover Screws: <strong>AP</strong> (Four Shown)<br />
I/P Module Removal<br />
2. Lift the cover off <strong>and</strong> put aside for installation.<br />
To remove I⁄P module:<br />
1. Disconnect the I/P wire from the terminal board.<br />
2. Using a 3 mm hex key, remove the four screws from around the perimeter of the I⁄P<br />
module.<br />
Figure 80<br />
<strong>SVI</strong> <strong>II</strong> <strong>AP</strong> High Flow Pneumatic Module with Single Acting Relay<br />
3. Lift the module off the positioner.<br />
I/P Module <strong>Installation</strong><br />
To install I⁄P module:<br />
1. Place the module in the designated area on the positioner.<br />
2. Using a 3 mm hex key, install the four screws around the perimeter of the I⁄P module.<br />
3. Replace the I/P wire connector on the terminal board.<br />
142