14.11.2013 Views

Masoneilan SVI II AP Installation and Maintenance ... - GE Energy

Masoneilan SVI II AP Installation and Maintenance ... - GE Energy

Masoneilan SVI II AP Installation and Maintenance ... - GE Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>GE</strong> Oil <strong>and</strong> Gas<br />

<strong>SVI</strong> <strong>II</strong> <strong>AP</strong> Instruction Manual<br />

Powering Up the <strong>SVI</strong> <strong>II</strong> <strong>AP</strong><br />

WARNING<br />

This process can cause the valve to move. Before proceeding<br />

be sure the valve is isolated from the process. Keep h<strong>and</strong>s<br />

clear from moving parts.<br />

NOTE<br />

When an <strong>SVI</strong> <strong>II</strong> <strong>AP</strong> is turned on it is advisable to apply the air<br />

supply before applying the electrical input signal.<br />

CAUTION<br />

Use of a low impedance voltage source damages the <strong>SVI</strong> <strong>II</strong><br />

<strong>AP</strong>. The <strong>SVI</strong> <strong>II</strong> <strong>AP</strong> input must be a current controlled source.<br />

The <strong>SVI</strong> <strong>II</strong> <strong>AP</strong> will not function normally if connected directly to<br />

a voltage source. However, direct connection to a current<br />

source of up to 30 V will not the damage the <strong>SVI</strong> <strong>II</strong> <strong>AP</strong>. A<br />

proper current source explicitly enables adjustment of the<br />

current in mA, not V.<br />

To power up the <strong>SVI</strong> <strong>II</strong> <strong>AP</strong>:<br />

1. Loosen the four (4) cover screws <strong>and</strong> remove the <strong>SVI</strong> <strong>II</strong> <strong>AP</strong> cover.<br />

2. Connect the +⁄- terminals from the <strong>SVI</strong> <strong>II</strong> <strong>AP</strong> to the current source. Connect + to + <strong>and</strong><br />

- to - (Figure 50 on page 66).<br />

3. Reinstall the cover <strong>and</strong> display.<br />

4. Adjust current to 12 mA. On initial power up of a newly installed <strong>SVI</strong> <strong>II</strong> <strong>AP</strong>, the<br />

positioner starts up in NORMAL mode <strong>and</strong> is operational in the default factory<br />

configuration. The positioner cycles through the NORMAL cycle menu <strong>and</strong> the<br />

following values appear:<br />

PRES: (Pressure - unit of measurement <strong>and</strong> value)<br />

SIGNAL<br />

POS (Position)<br />

An exclamation point (!) in the top left corner of the display window indicates that<br />

there is further instrument status available.*<br />

5. Proceed to Calibration <strong>and</strong> Configuration.<br />

* For firmware version 3.2.1, the supply pressure appears on the LCD. Additionally, Stops<br />

results <strong>and</strong> Autotune results, stay displayed until cleared.<br />

NOTE<br />

If the <strong>SVI</strong> <strong>II</strong> <strong>AP</strong> is specified without local pushbuttons <strong>and</strong><br />

display, local operation is not available. Configure <strong>and</strong><br />

calibrate with ValVue or a H<strong>and</strong> Held HART Communicator.<br />

68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!