Masoneilan SVI II AP Installation and Maintenance ... - GE Energy
Masoneilan SVI II AP Installation and Maintenance ... - GE Energy
Masoneilan SVI II AP Installation and Maintenance ... - GE Energy
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>GE</strong> Oil <strong>and</strong> Gas<br />
<strong>SVI</strong> <strong>II</strong> <strong>AP</strong> Instruction Manual<br />
Check Out Procedures<br />
<strong>SVI</strong> <strong>II</strong> <strong>AP</strong> checkout consists of physical <strong>and</strong> operational checkout procedures. The<br />
physical checkout procedures include:<br />
Inspect the Actuator, Linkages, or Rotary Adapter<br />
Verify the Mounting <strong>and</strong> Linkage Adjustment<br />
Check the Magnet<br />
Physical Inspection<br />
Check the Air Supply<br />
Check the Electronic Module Connections<br />
<strong>SVI</strong> <strong>II</strong> <strong>AP</strong> checkout consists of physical <strong>and</strong> operational checkout procedures. The<br />
physical checkout procedures include:<br />
Inspect the Actuator, Linkages, or Rotary Adapter<br />
Verify the Mounting <strong>and</strong> Linkage Adjustment<br />
Check the Magnet<br />
Check the Air Supply<br />
Check the Electronic Module Connections<br />
Valve Mounting<br />
The Air Supply<br />
Actuator, Linkages, or Rotary Adapter<br />
Verify that the mounting has not been damaged in shipment for a pre-mounted <strong>SVI</strong> <strong>II</strong> <strong>AP</strong>,<br />
physically inspect the actuator, linkage. Record the following information for the<br />
configuration checkout:<br />
1. Valve Air to Open (ATO) or Air to Close (ATC)<br />
2. Actuator pressure rating<br />
3. Actuator bench range<br />
4. Inherent trim characteristic of the control valve; linear, equal percentage, or other.<br />
NOTE<br />
Refer to the valve data sheet or model number of control<br />
valve.<br />
62