14.11.2013 Views

Masoneilan SVI II AP Installation and Maintenance ... - GE Energy

Masoneilan SVI II AP Installation and Maintenance ... - GE Energy

Masoneilan SVI II AP Installation and Maintenance ... - GE Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>GE</strong> Oil <strong>and</strong> Gas<br />

<strong>SVI</strong> <strong>II</strong> <strong>AP</strong> Instruction Manual<br />

Balance Pressure<br />

Actuator Piping<br />

The double-acting relay is designed to deliver pressure on both sides of a piston type<br />

actuator, so that the cylinder can provide the required thrust <strong>and</strong> stiffness. This stiffness is<br />

factory adjusted to 70% of the supply pressure. This means that, without any unbalance<br />

forces from the valve stem, both outputs deliver roughly 70% of air supply pressure.<br />

Although it is not recommended, the stiffness can be adjusted by moving the Adjustable<br />

Seat assembly up or down.<br />

Connect Output 1, labeled ACT 1 to the inlet port of the actuator in accordance with<br />

Figure 45. Output 2 labeled ACT 2 connects to the opposing actuator port.<br />

Figure 45<br />

Double Acting Positioner ATO⁄ATC Settings for Reciprocating Valves<br />

58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!