04.10.2014 Views

JPR 8550.1 - Nasa

JPR 8550.1 - Nasa

JPR 8550.1 - Nasa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

JSC Environmental Compliance<br />

Procedural Requirements<br />

<strong>JPR</strong> No.<br />

<strong>8550.1</strong>A XXXX.X<br />

Effective Date:<br />

Johnson Space Center • Environmental Compliance Program<br />

Expiration Date:<br />

Expiration Date:<br />

Page Number<br />

3/25/2011<br />

3/25/2016<br />

[Leave Blank]<br />

Page 114 of 123<br />

Appendix A—Glossary of Terms and Acronyms<br />

A.1 ACM Asbestos Containing Material<br />

A.2 Alternate Fueled Vehicles Vehicles designed to operate on fuels other than gasoline,<br />

such as propane, natural gas, and ethanol. JSC is required<br />

to reduce our annual petroleum consumption by at least 20%<br />

by end of FY 2005 under Executive Order 13149. In addition,<br />

75% of light-duty vehicle acquisitions shall be AFVs to meet<br />

the Energy Policy Act of 1992 (EPAct).<br />

A.3 BMP Best Management Practice; Measures taken related to<br />

specific activities or processes which employees are required<br />

to follow in order to achieve compliance or pollution<br />

prevention (generally related to storm water pollution<br />

prevention).<br />

A.4 CATEX Categorical Exclusion<br />

A.5 Comprehensive Procurement The Environmental Protection Agency’s list of designated<br />

Guidelines (CPG)........................................<br />

products that are commercially available that contain<br />

recycled or recovered content with the minimum recycled<br />

content percentages that Federal agencies are required to<br />

procure.<br />

A.6 Containment System or structure designed to prevent the accidental<br />

release of materials.<br />

A.7 Contract Program Manager The on-site individual (contractor) assigned overall<br />

responsibility to manage the execution of a contract.<br />

A.8 EA Environmental Assessment<br />

A.9 EIS Environmental Impact Statement<br />

A.10 Emission Control Equipment Equipment that controls the operating conditions of the<br />

emission source equipment, such as temperature or<br />

pressure controls, fuel controls, air mix controls, dust<br />

collectors, fume collectors, scrubbers, carbon vent collectors<br />

and emission monitoring equipment.<br />

A.11 Emission Source Equipment Equipment that generates an air vent or emission such as a<br />

boiler, cooling tower, fueled generator, painting, sandblasting<br />

or wood cutting operations<br />

A.12 Employee Any person who is assigned to work on-site at JSC (includes<br />

NASA owned or leased portions of EF, SCTF and EPFOL).<br />

Verify correct version before use at<br />

http://server-mpo.arc.nasa.gov/Services/CDMSDocs/Centers/JSC/Home.tml.<br />

JSC Form JF2420B (MS Word August 28, 2006) (Revised May 30, 2007)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!