04.10.2014 Views

JPR 8550.1 - Nasa

JPR 8550.1 - Nasa

JPR 8550.1 - Nasa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

JSC Environmental Compliance<br />

Procedural Requirements<br />

<strong>JPR</strong> No.<br />

<strong>8550.1</strong>A XXXX.X<br />

Effective Date:<br />

Johnson Space Center • Environmental Compliance Program<br />

Expiration Date:<br />

Expiration Date:<br />

Page Number<br />

3/25/2011<br />

3/25/2016<br />

[Leave Blank]<br />

Page 69 of 123<br />

(1) The types of activities covered by the SECP;<br />

(2) The combined calculated disturbed area in acres;<br />

(3) How controls will be selected to ensure effectiveness;<br />

(4) How controls will be installed, inspected, maintained and documented;<br />

(5) The name and phone number of an individual who will be responsible for ensuring that<br />

SECP requirements are implemented and monitored; and<br />

(6) The start and proposed end date of the SECP.<br />

d. The responsible Organization/Contractor shall submit a revised plan if any item in 3, above,<br />

changes or if the selected controls are not effective.<br />

e. The Organization/Contractor responsible for conducting the activities in the SECP shall<br />

maintain a copy of the SECP and documentation showing that all requirements were followed<br />

during the activities.<br />

f. The responsible Organization/Contractor shall maintain these records for at least three years<br />

from completion of the activity.<br />

g. Each standard SECP shall be approved for a period of one year, unless another period is<br />

specifically identified in the SECP and approved by the EO.<br />

6.3.13 JSC and EF Storm Water Pollution Prevention Teams (SWPPTs)<br />

a. Each SWPPT team shall be responsible for the following at their facility:<br />

(1) Setting storm water pollution prevention goals;<br />

(2) Evaluating existing conditions;<br />

(3) Developing BMPs relating to certain industrial activities;<br />

(4) Ensuring that required inspections are conducted;<br />

(5) Reviewing the results of sampling events, periodic monitoring, quarterly visual inspections<br />

and annual comprehensive compliance evaluations to assess compliance with the Multi-Sector<br />

Industrial General Permit for Storm Water and the JSC and EF SWPPPs;<br />

(6) Determining the effectiveness of each SWPPP to reduce the exposure of pollutants to<br />

storm water runoff; and<br />

(7) Revising the Plan when it is found ineffective or inaccurate in accordance with the general<br />

permit.<br />

6.4 Responsibilities<br />

6.4.1 All employees shall:<br />

Verify correct version before use at<br />

http://server-mpo.arc.nasa.gov/Services/CDMSDocs/Centers/JSC/Home.tml.<br />

JSC Form JF2420B (MS Word August 28, 2006) (Revised May 30, 2007)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!