JSC Environmental Compliance<br />
Procedural Requirements<br />
<strong>JPR</strong> No.<br />
<strong>8550.1</strong>A XXXX.X<br />
Effective Date:<br />
Johnson Space Center • Environmental Compliance Program<br />
Expiration Date:<br />
Expiration Date:<br />
Page Number<br />
3/25/2011<br />
3/25/2016<br />
[Leave Blank]<br />
Page 20 of 123<br />
(3) Upon receipt of a JF1138, the EO shall work with the PM to determine if any additional<br />
environmental assessment is needed and to identify environmental requirements and<br />
constraints to ensure compliance with regulations and NASA/JSC policy and procedures; and<br />
(4) The EO shall then respond with the identified environmental requirements or constraints.<br />
b. If changes in the project scope occur, a revised JF 1138 shall be completed.<br />
c. For completed JF 1138 checklists older than one year, the PM shall review the JF 1138 and<br />
revise it as needed.<br />
2.3.4 The PM shall:<br />
a. Incorporate the identified requirements within the scope of the project/task;<br />
b. Incorporate identifiable costs and schedule impacts to comply with environmental<br />
requirements into the overall task or project management plan and budget;<br />
c. Incorporate all applicable environmentally preferable purchasing (EPP) criteria into the<br />
design or procurement. See Chapter 11, Sustainable Acquisition, especially section 11.2.3 for<br />
a list of required practices.<br />
d. Be responsible for providing the necessary follow-up information to the EO when information<br />
is requested in order to determine environmental requirements or submit permit applications or<br />
for other required documentation.<br />
e. Ensure that adequate resources are available for environmental support.<br />
f. During the construction or implementation phase, provide installation of any monitoring<br />
equipment or implementation of process controls that have been identified as required by the<br />
EO.<br />
g. Provide resources necessary for environmental support such as ISW transportation and<br />
disposal.<br />
h. At completion of construction (i.e., prior to accepting beneficial occupancy and completion of<br />
the task or project construction/installation), or prior to operating newly installed equipment or<br />
implementing a new process, ensure that the environmental requirements previously identified<br />
by the EO have been completely included or implemented.<br />
2.3.5 The Process Owner or Owner/Operator shall:<br />
2.3.5.1 During operation, maintenance, and the sustaining phase, ensure:<br />
a. Operating and maintenance procedures are developed to ensure that equipment is operated<br />
properly;<br />
b. Training is provided to personnel responsible for operating and maintaining equipment in<br />
accordance with identified environmental constraints;<br />
Verify correct version before use at<br />
http://server-mpo.arc.nasa.gov/Services/CDMSDocs/Centers/JSC/Home.tml.<br />
JSC Form JF2420B (MS Word August 28, 2006) (Revised May 30, 2007)