JSC Environmental Compliance<br />

Procedural Requirements<br />

<strong>JPR</strong> No.<br />

<strong>8550.1</strong>A XXXX.X<br />

Effective Date:<br />

Johnson Space Center • Environmental Compliance Program<br />

Expiration Date:<br />

Expiration Date:<br />

Page Number<br />

3/25/2011<br />

3/25/2016<br />

[Leave Blank]<br />

Page 83 of 123<br />

(2) Inert suspended solids greater than 250 mg/L;<br />

(3) Dissolved solids greater than 1000 mg/L; and<br />

(4) Excessive discoloration caused by dyes or vegetable tanning solutions.<br />

d. The IU shall consult with the EO early in the planning process to ensure that there is no<br />

impact to schedule process. If an IU submits a request to discharge an element at<br />

concentrations greater than those listed in Table 4 or a prohibited substance, the EO will<br />

generally need to request and receive approval from the POTW that receives and treats our<br />

wastewater. This may require additional information and may take additional time to receive.<br />

8.3 Responsibilities<br />

8.3.1 All employees shall:<br />

Control discharges of wastewater to the sanitary sewer from facilities, processes, or operations<br />

under their control or direction.<br />

8.3.2 Generators of wastewater shall:<br />

a. Know and follow JSC policy and procedures for discharge of wastewater;<br />

b. Provide necessary information and acquire necessary approval to discharge wastes to the<br />

sanitary sewer from the EO prior to discharge.<br />

8.3.3 FMs shall:<br />

Know the facilities and operations in their areas of responsibility that are, or have the potential<br />

to be, sources of pollution introduced to the sanitary sewer and be aware of the acceptable<br />

parameters.<br />

8.3.4 DLOs shall:<br />

a. Develop and implement procedures and requirements to control processes or operations that<br />

discharge industrial wastewater to sanitary sewer;<br />

b. Ensure that their facilities do not discharge unapproved or prohibited wastewater to the sanitary<br />

sewer;<br />

c. Provide required notifications and receive approval, when required, from the EO; and<br />

d. Notify the EO when discharges from intermittent or batch processes occur, when those<br />

discharges are required to be sampled as determined by the EO.<br />

NOTE: The wastewater generator will be informed of this requirement by the EO based on<br />

review and approval of the JF1109.<br />

8.3.5 The EO shall:<br />

Verify correct version before use at<br />

http://server-mpo.arc.nasa.gov/Services/CDMSDocs/Centers/JSC/Home.tml.<br />

JSC Form JF2420B (MS Word August 28, 2006) (Revised May 30, 2007)