JPR 8550.1 - Nasa
JPR 8550.1 - Nasa
JPR 8550.1 - Nasa
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
JSC Environmental Compliance<br />
Procedural Requirements<br />
<strong>JPR</strong> No.<br />
<strong>8550.1</strong>A XXXX.X<br />
Effective Date:<br />
Johnson Space Center • Environmental Compliance Program<br />
Expiration Date:<br />
Expiration Date:<br />
Page Number<br />
3/25/2011<br />
3/25/2016<br />
[Leave Blank]<br />
Page 27 of 123<br />
The ISW generator shall conduct an evaluation on the proper ISW management and<br />
accumulation process prior to generating any waste from an operation using any chemical.<br />
3.3.2 Considerations<br />
a. The Material Safety Data Sheet (MSDS) and product labels are two primary sources of<br />
information concerning handling of ISW generated from using the product. The evaluation shall<br />
consider all the following:<br />
(1) Segregation issues (if any ISW can be safely mixed or stored together);<br />
(2) ISW accumulation container type (i.e., plastic, glass or special);<br />
(3) ISW container size;<br />
(4) ISW accumulation location;<br />
(5) ISW accumulation time limits;<br />
(6) ISW accumulation area inspection requirements; and<br />
(7) Special or additional requirements for laboratories that use multiple chemicals and<br />
generate ISW mixtures.<br />
Note: The EPA Chemical Compatibility Chart is available at<br />
http://www.uos.harvard.edu/ehs/environmental/EPAChemicalCompatibilityChart.pdf.<br />
3.4 Notification Requirements<br />
3.4.1 Waste Generation Notification<br />
a. For each waste generated, ISW generators shall:<br />
(1) Notify the EO by completing a form JF1104, Waste Notification, prior to initially generating<br />
the waste.<br />
(2) Submit a revised form JF1104, Waste Notification, prior to any change in the process that<br />
produces the ISW (e.g., change in products used or quantity of waste generated).<br />
3.4.2 Request for Drums and Carboys<br />
a. For quantities that can be managed in a carboy or 55 gallon drum, ISW generators shall request<br />
a carboy or drum.<br />
b. ISW generators requiring a carboy or 55 gallon drum shall submit a request to Work Control<br />
(x32038).<br />
c. Generally, the carboy or drum shall be delivered within three working days of the request, if<br />
adequate, and if accurate information has been provided.<br />
3.4.3 Request for Bulk Containers<br />
Verify correct version before use at<br />
http://server-mpo.arc.nasa.gov/Services/CDMSDocs/Centers/JSC/Home.tml.<br />
JSC Form JF2420B (MS Word August 28, 2006) (Revised May 30, 2007)