JSC Environmental Compliance<br />

Procedural Requirements<br />

<strong>JPR</strong> No.<br />

<strong>8550.1</strong>A XXXX.X<br />

Effective Date:<br />

Johnson Space Center • Environmental Compliance Program<br />

Expiration Date:<br />

Expiration Date:<br />

Page Number<br />

3/25/2011<br />

3/25/2016<br />

[Leave Blank]<br />

Page 73 of 123<br />

6.5 Personnel Training and Certification Requirements<br />

a. Personnel who perform any of the following functions shall annually complete storm water<br />

pollution prevention training (available online or by contacting the EO):<br />

(1) Handle any type of material, product, chemical, or waste (i.e. paints, solvents, fuel,<br />

petroleum products, oils, greases, lubricants, soaps, detergents, corrosives, etc.) outdoors or<br />

where storm water may come into contact with it;<br />

(2) Maintain vehicles, aircraft or other equipment where storm water may come into contact<br />

with oil or chemicals used during the activities;<br />

(3) Wash vehicles, aircraft or other equipment where the wash water may enter a storm drain<br />

or flow onto the ground;<br />

(4) Operate or store heavy machinery or other off-road equipment;<br />

(5) Store, handle or transfer raw materials or excess supplies outdoors;<br />

(6) Place materials in rolloffs, dumpsters or scrap metal bins to dispose of materials;<br />

(7) Work in an area that uses or stores wood or wood pallets;<br />

(8) Recycle mixed paper or cardboard;<br />

(9) Dig or disturb soil or vegetative cover in any manner;<br />

(10) Stockpile soil, sand, gravel, or other aggregate materials;<br />

(11) Are a member of the Storm Water Pollution Prevention Team;<br />

(12) Supervise employees that perform any of the functions above;<br />

(13) Facility Managers or Alternate Facility Managers of a building or area where the above<br />

functions are performed; or<br />

(14) COTRs or Technical Management Representatives of a contract or portion of a contract<br />

where the contractor performs any of the above activities.<br />

6.6 Records and Forms<br />

a. ―Excavation and Boring Permit‖ records are kept by the EO, for a period of 3 years after<br />

completion of the project.<br />

b. The Construction Site Operator, identified in the NOI, shall maintain a copy of the SWPPP<br />

and all related records required for small and large construction projects during the<br />

construction activity.<br />

c. After the construction activity is terminated and the construction contractor leaves JSC, the<br />

files from 2, above, is transferred to the CO or COTR and shall be maintained, as applicable, in<br />

the official project files and retained for at least 3 years following completion of the project.<br />

Verify correct version before use at<br />

http://server-mpo.arc.nasa.gov/Services/CDMSDocs/Centers/JSC/Home.tml.<br />

JSC Form JF2420B (MS Word August 28, 2006) (Revised May 30, 2007)