JSC Environmental Compliance<br />

Procedural Requirements<br />

<strong>JPR</strong> No.<br />

<strong>8550.1</strong>A XXXX.X<br />

Effective Date:<br />

Johnson Space Center • Environmental Compliance Program<br />

Expiration Date:<br />

Expiration Date:<br />

Page Number<br />

3/25/2011<br />

3/25/2016<br />

[Leave Blank]<br />

Page 67 of 123<br />

(j) The EO or designee shall perform periodic monitoring of construction sites and follow the<br />

nonconformance reporting procedures established within the EMS for any observed<br />

compliance deficiencies.<br />

(k) The PM shall correct all compliance deficiencies.<br />

6.3.10 Small Construction Activity<br />

a. Generators shall consider construction and maintenance activities that will disturb equal to<br />

or more than one acre but less than five acres of soil as small construction activities.<br />

b. For small construction activities, the PM shall prepare and implement a SWPPP, sign and<br />

post a construction site notice, notify any Municipal Separate Storm Sewer System (MS4) that<br />

storm water will discharge into, and comply with the requirements in the general permit prior to<br />

disturbance of any soil.<br />

c. PM shall contact the EO in the early planning stages if a project may fall into this category in<br />

order to identify and coordinate the requirements.<br />

d. PM shall ensure that all required actions are completed before de-vegetation or stock piling<br />

of soil begins, including the submittal of a SWPPP and approval by the EO.<br />

e. The PM or designee shall plan, conduct, and document inspections required by the TCEQ.<br />

JSC requires a 7-day inspection schedule (every seven calendar days on a specifically defined<br />

day), which has been approved by the TCEQ as an alternative inspection schedule.<br />

f. PM or designee shall include disturbed areas of the construction site that have not been<br />

finally stabilized, areas used for storage of materials that are exposed to precipitation, and<br />

structural controls for evidence of, or the potential for, pollutants entering the drainage system<br />

in the required inspections.<br />

g. PM or designee shall perform inspections for locations where vehicles enter or exit the site<br />

for evidence of off-site sediment tracking.<br />

h. PM or designated site supervisor shall inspect construction sites after each rain event.<br />

i. The construction contractor shall perform operation and maintenance of controls.<br />

j. The EO shall perform periodic monitoring of construction sites and follow the<br />

nonconformance reporting procedures established within the EMS for any observed<br />

compliance deficiencies.<br />

k. The PM shall correct all compliance deficiencies.<br />

Note: Projects that will disturb an area of one to less than five acres of soil during construction<br />

are considered small construction activities.<br />

6.3.11 Large Construction Activity<br />

Verify correct version before use at<br />

http://server-mpo.arc.nasa.gov/Services/CDMSDocs/Centers/JSC/Home.tml.<br />

JSC Form JF2420B (MS Word August 28, 2006) (Revised May 30, 2007)