JSC Environmental Compliance<br />
Procedural Requirements<br />
<strong>JPR</strong> No.<br />
<strong>8550.1</strong>A XXXX.X<br />
Effective Date:<br />
Johnson Space Center • Environmental Compliance Program<br />
Expiration Date:<br />
Expiration Date:<br />
Page Number<br />
3/25/2011<br />
3/25/2016<br />
[Leave Blank]<br />
Page 23 of 123<br />
2.5 Responsibilities<br />
2.5.1 The JSC Organization<br />
The JSC Organization responsible for pre-planning, planning or designing shall designate a<br />
project or task manager.<br />
2.5.2 The designated PM shall:<br />
a. Ensure that all required planning and documentation required in this section are<br />
implemented;<br />
b. Ensure that environmental planning requirements are completed no later than when the<br />
design or task plan is approximately 30% complete;<br />
c. Arrange for funding to complete required environmental planning and for incorporation of<br />
environmental requirements in the design and implementation of the project;<br />
d. Serve as a technical resource and provide information as requested by the EO to assist in<br />
identifying the applicable environmental impacts and compliance requirements; and<br />
e. Maintain project-specific environmental documentation identified by the EO.<br />
2.5.3 The DLO (proponent or beneficiary of the task/project) shall:<br />
Be responsible for the post construction, operation, maintenance, and eventual shutdown,<br />
decommissioning, demolition, and closure of a process with any environmental constraints<br />
shall provide resources and conduct the necessary activities to ensure compliance. This<br />
responsibility includes initiating and maintaining contact with the EO for assistance in<br />
indentifying environmental constraints throughout the lifecycle of the project/task.<br />
2.5.4 The EO shall:<br />
a. Determine the category of documentation of environmental impacts that are required for<br />
each program, project, or activity that the EO is made aware of.<br />
b. Assist PMs and other employees in determining the requirements for compliance with<br />
environmental regulations for program, projects, and other activities.<br />
c. Provide technical assistance to the JSC Organization’s PM, as requested, to complete<br />
JF1138 EPCs and JF1119 RECs, or respond to other requests for technical assistance<br />
associated with compliance and environmental planning.<br />
d. Support the implementation of mitigation measures, including but not limited to obtaining the<br />
necessary environmental permits or authorizations identified within the projects and programs<br />
once funding for preparation of applications and supporting studies are provided, provide<br />
waste transportation and disposal support, oversight and inspections once funding is provided<br />
by the JSC organization.<br />