JSC Environmental Compliance<br />

Procedural Requirements<br />

<strong>JPR</strong> No.<br />

<strong>8550.1</strong>A XXXX.X<br />

Effective Date:<br />

Johnson Space Center • Environmental Compliance Program<br />

Expiration Date:<br />

Expiration Date:<br />

Page Number<br />

3/25/2011<br />

3/25/2016<br />

[Leave Blank]<br />

Page 23 of 123<br />

2.5 Responsibilities<br />

2.5.1 The JSC Organization<br />

The JSC Organization responsible for pre-planning, planning or designing shall designate a<br />

project or task manager.<br />

2.5.2 The designated PM shall:<br />

a. Ensure that all required planning and documentation required in this section are<br />

implemented;<br />

b. Ensure that environmental planning requirements are completed no later than when the<br />

design or task plan is approximately 30% complete;<br />

c. Arrange for funding to complete required environmental planning and for incorporation of<br />

environmental requirements in the design and implementation of the project;<br />

d. Serve as a technical resource and provide information as requested by the EO to assist in<br />

identifying the applicable environmental impacts and compliance requirements; and<br />

e. Maintain project-specific environmental documentation identified by the EO.<br />

2.5.3 The DLO (proponent or beneficiary of the task/project) shall:<br />

Be responsible for the post construction, operation, maintenance, and eventual shutdown,<br />

decommissioning, demolition, and closure of a process with any environmental constraints<br />

shall provide resources and conduct the necessary activities to ensure compliance. This<br />

responsibility includes initiating and maintaining contact with the EO for assistance in<br />

indentifying environmental constraints throughout the lifecycle of the project/task.<br />

2.5.4 The EO shall:<br />

a. Determine the category of documentation of environmental impacts that are required for<br />

each program, project, or activity that the EO is made aware of.<br />

b. Assist PMs and other employees in determining the requirements for compliance with<br />

environmental regulations for program, projects, and other activities.<br />

c. Provide technical assistance to the JSC Organization’s PM, as requested, to complete<br />

JF1138 EPCs and JF1119 RECs, or respond to other requests for technical assistance<br />

associated with compliance and environmental planning.<br />

d. Support the implementation of mitigation measures, including but not limited to obtaining the<br />

necessary environmental permits or authorizations identified within the projects and programs<br />

once funding for preparation of applications and supporting studies are provided, provide<br />

waste transportation and disposal support, oversight and inspections once funding is provided<br />

by the JSC organization.<br />

Verify correct version before use at<br />

http://server-mpo.arc.nasa.gov/Services/CDMSDocs/Centers/JSC/Home.tml.<br />

JSC Form JF2420B (MS Word August 28, 2006) (Revised May 30, 2007)