30.01.2015 Views

Picture Perfect 4.6 User Manual - UTCFS Global Security Products

Picture Perfect 4.6 User Manual - UTCFS Global Security Products

Picture Perfect 4.6 User Manual - UTCFS Global Security Products

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 7<br />

Alarm/activity configuration<br />

107<br />

Creating route definitions<br />

This feature can be used in conjunction with route points, if you want to restrict the display of alarms<br />

and activity. If you want all alarms and activity to be displayed for all operators, you do not need to<br />

configure this feature. Activity routing is restricted to badge activity and digital input (DI) activity.<br />

Other activity, such as operator activity, cannot be routed to a specific operator.<br />

Your site should be partitioned into sections that represent various sets of alarms and activity (inputs,<br />

input groups, output devices, and alarm priorities). A route definition corresponds to one section of<br />

your <strong>Picture</strong> <strong>Perfect</strong> site.<br />

For example, assume a <strong>Picture</strong> <strong>Perfect</strong> site consists of two buildings: Building A and Building B. In<br />

each of these buildings, there is an operator at an alarm monitoring station: Operator A and Operator<br />

B. During the day, two operators monitor the site. At night, only one operator monitors the site from<br />

Building A.<br />

One possible configuration could be that the day shift operators monitor alarms and activity that<br />

occur in their respective building, and the night shift operator monitors alarms and activity that occur<br />

in both buildings. This configuration could be extended such that, during the day, if an operator did<br />

not respond to an alarm in his building, the alarm would be “bumped” to the operator in the other<br />

building.<br />

Note:<br />

Example<br />

Changes made to route points do not take effect until <strong>Picture</strong> <strong>Perfect</strong> is restarted.<br />

The ABC Corporation is comprised of a single facility, <strong>Global</strong>. This facility is made up of two<br />

buildings: Buildings 1 and 2 and the route definitions are defined as “Building 1” and “Building 2”.<br />

Figure 44.Route Definition Form

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!