11.07.2015 Views

Adapting to Climate Change: Assessing the World Bank Group ...

Adapting to Climate Change: Assessing the World Bank Group ...

Adapting to Climate Change: Assessing the World Bank Group ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ENDNOTES39 This review draws upon a GFDRR work product – “Streng<strong>the</strong>ning Wea<strong>the</strong>r and <strong>Climate</strong>Information Decision-support Systems (WCIDS) The <strong>World</strong> <strong>Bank</strong> Portfolio 1996 <strong>to</strong> 2011” --that is in preparation. The GFDRR WCIDS team kindly shared its early draft with IEG insupport of our review.40 Information based on ICRs for Poland (P053796), Mexico (P007713), Peru(P054667),Dominican Republic41 There has been increasing use of satellite-based remote-sensing measurements. <strong>World</strong><strong>Bank</strong> studies have used TRMM (Tropical Rainfall Measuring Mission) data, which is freelyavailable and covers areas that are sparsely gauged. However, remote sensing can neverfully substitute for surface-based measurements.42 “The transition <strong>to</strong> AWS is often instigated by a perception that <strong>the</strong>se systems are cheaper<strong>to</strong> operate and easier <strong>to</strong> manage than human observers. The ETAWS cautioned that this wasnot <strong>the</strong> experience of a number of member countries. Therefore, it identified a number ofresponsibilities and costs that may not be immediately apparent <strong>to</strong> those that adoptau<strong>to</strong>matic systems.” WMO. 2009. Implementation and use of Au<strong>to</strong>matic Wea<strong>the</strong>r Stations(AWSs) (Submitted by <strong>the</strong> WMO Secretariat). AOPCXV Doc. 6.2a43 While some climate change studies attempt <strong>to</strong> describe <strong>the</strong> probability distribution offuture outcomes, <strong>the</strong>y typically do this by combining a large number of different climatemodels and/or parameter realizations and <strong>the</strong>n implicitly assuming that each inputpossibility is equally likely. This generates a distribution across future climate states, butthis is not a true probability distribution.44 See Ullsfjord et al, who find that a Norwegian hydropower plant should enlarge itscapacity <strong>to</strong> take advantage of enhanced snowmelt over coming decades.45 A study of Asian Megacities (<strong>World</strong> <strong>Bank</strong> 2010) noted that “vulnerability mapping, landuse planning and zoning could be used <strong>to</strong> restrict future development in hazardouslocations, ultimately retiring key infrastructure and vulnerable buildings in <strong>the</strong>se areas,”and support “zoning controls <strong>to</strong> ensure that low income housing is located outside of floodprone zones” for Ho Chi Minh City. It also identified “Retreat” as one of four possibleadaptive options, noting “planning option[s] <strong>to</strong> reduce exposure can be applied in urban areasthrough urban land use plans and zoning codes.”A study of North African coastal cities (<strong>World</strong> <strong>Bank</strong> 2010) calls for an integrated approachfor detailed land use planning and urban design for Casablanca, fac<strong>to</strong>ring in climate-relatedvulnerabilities in considering use for vacant land. It notes that floodprone areas should becarefully screened <strong>to</strong> avoid worsening inundation and drainage problems. It notes that“climate-resilient urban planning will be crucial for Tunis <strong>to</strong> manage <strong>the</strong> risks caused bynatural hazards and climate change,” recommending upgrading of drainage, containment ofillegal housing and careful zoning with green spaces.46 An IEG search for projects supporting large scale spatial planning or land-use zoning fordisaster risk reduction found only one example, <strong>the</strong> India Coastal Zone ManagementProject. Land use zoning projects were identified via text search of documents, polling ofknowledgeable urban and land management staff, and review of a <strong>Bank</strong>-identified portfolioof active and pipeline land use planning and zoning projects over 2003-9 (<strong>World</strong> <strong>Bank</strong> 2009,147

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!