12.07.2015 Views

Temperature Controller - Staveb AG

Temperature Controller - Staveb AG

Temperature Controller - Staveb AG

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Configuration and Basic Operation 3-11Example Operation Procedure — Select °C1. Press the key for at least 3 seconds to move from the Operationfunction group to the Initial Setting function group.Figure 3.9Operation function group2. Select the <strong>Temperature</strong> Unit parameter by pressing the M key. Press theU or D key to select either °C (c) or °F (f).Figure 3.10Initial setting function groupInput type3. To return to the Operation function group press the key for at least1 second.Figure 3.11<strong>Temperature</strong> unitConfiguring the SP Figure 3.12Operation function groupThe Operation function group is displayed when the Bulletin 900-TC32 isturned ON. The upper display (No. 1 display) shows the process value (PV),and the lower display (No. 2 display) displays the set point (SV or SP).Changing the SPThe set point cannot be changed when the Operation/Adjustment Protectionparameter is set to 3. For details, see p. 4-23, Using the Key Protect Function Group.To change the set point, press the U or D key in the PV/SP parameter(Operation function group), and load the desired value. The new set point isloaded into memory 2 seconds after you have specified the new value.Publication 900-UM003C-EN-E - January 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!