13.07.2015 Views

annrep 1011 1 to 148.qxp - Department of Defence

annrep 1011 1 to 148.qxp - Department of Defence

annrep 1011 1 to 148.qxp - Department of Defence

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

D E P A R T M E N T O F D E F E N C EWarfare Strategic Direction Capability for the DOD.P u r p o s e o f t h e P r o g r a m m eCommand and Management Information Systems is a subprogramme<strong>of</strong> the General Support Programme and is <strong>to</strong> providecommand and management information and relatedservices <strong>to</strong> the department.O b j e c t i v e s a n d M e a s u r e sProvide the department with key information and communicationsystems byInformation Systems (DEIS) Master Plan, as per theprogramme and project miles<strong>to</strong>nes and associated deliverables.S u b p r o g r a m m eCommand and Management Information Systems providescommand and management information systems andrelated services <strong>to</strong> the department. Funding is distributedaccording <strong>to</strong> the number and size <strong>of</strong> mainframe systems, thecommunication infrastructure operated by the department,and maintenance and upgrading requirements.Ensuring that the mainframe service is available 98 percent <strong>of</strong> the time and the Wide Area Network 95 per cen<strong>to</strong>f the time.Providing Information and Communication Systemssolutions in accordance with the <strong>Defence</strong> EnterpriseO u t p u t D e t a i lTable 11.2 below reports <strong>of</strong> the achievement <strong>of</strong> the outputs,performance indica<strong>to</strong>rs and targets as specified in the DODStrategic Plan FY2010/11.Table 11.2:Command and Management Information Systems Output Detail for FY2010/11OutputIntegratedInformationand CommunicationSystems (ICS)solutions andenablers forthe DODPerformanceIndica<strong>to</strong>rLevel <strong>of</strong> compliancewith the DOD ICSProject Portfolio (DEISMaster Plan) wrt ICSsolutions90%AnnualTarget87%Actual TargetAchievementReasons for Over/ UnderAchievementUnder achievement. Fundswere reallocated from theDEIS MP <strong>to</strong> the upgrade <strong>of</strong>the DOD Central Server andthis project caused deviationin achievement <strong>of</strong> projects onthe DEIS MP. When the procuremen<strong>to</strong>f the CentralServer did not materialise inthis FY, the expenditure andplanned activities did not takeplace on the DEIS MPThe Electronic ContentManagement System (ECMS)project was delayedAchievedSupportedDOD ICS andJointCommandand ControlProductSystemCapabilityMinimum percentageavailability <strong>of</strong> ICS supportcapabilityPercentage availability<strong>of</strong> all corporate telecommunicationsandinformation technologyproduct systemsand products98% availability <strong>of</strong>mainframe serviceat all times95% availability <strong>of</strong>the Wide AreaNetwork at all times98% availability <strong>of</strong>the DOD tele-communicationbackboneat all times99.94% availability <strong>of</strong>mainframe service atall times99.42% availability <strong>of</strong>the Wide AreaNetwork at all times98.33% availability <strong>of</strong>the DOD tele-communicationbackbone atall timesAchieved. The Wider AreaNetwork was reconfigured inorder <strong>to</strong> implement redundancyin terms <strong>of</strong> connectivityAchievedANNUAL REPORT FY 2010/2011 91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!