13.07.2015 Views

Sepam - HV/MV Protection and control units (ENG) - Trinet

Sepam - HV/MV Protection and control units (ENG) - Trinet

Sepam - HV/MV Protection and control units (ENG) - Trinet

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

InstallationContentschapter / pageinstallation 1/2use conditions 1/2installation of <strong>Sepam</strong> 2000 1/2h<strong>and</strong>ling, transport <strong>and</strong> storage 1/2environment of the installed <strong>Sepam</strong> 2000 1/2equipment identification 1/3identification of <strong>Sepam</strong> 2000 1/3accessories supplied with <strong>Sepam</strong> 2000 1/4optional accessories 1/5assembly <strong>and</strong> wiring 1/6dimensions <strong>and</strong> drilling 1/6assembly 1/6<strong>Sepam</strong> 2000 components 1/7connections principle 1/7use <strong>and</strong> connection of current inputs to CTs 1/8connection of 1 A or 5 A CTs 1/8selection of operating modes 1/8CCA 660 or CCA 650 connector 1/9use <strong>and</strong> connection of current inputs to CSPs 1/10CSP current sensors 1/10connection of CSPs 1/10accessories for CSP current sensors 1/11selection of operating modes (microswitches) 1/14use <strong>and</strong> connection of split core balance CTs 1/15PO, GO split core balance CTs 1/15assembly of core balance CTs 1/15connection of split core balance CTs 1/15selection of operating mode (microswitches) 1/15use <strong>and</strong> connection of CSH 120 <strong>and</strong> CSH 200 core balance CTs 1/16CSH 120 <strong>and</strong> CSH 200 core balance CTs 1/16selection of operating mode (microswitches) 1/16connection of CSH 120 <strong>and</strong> CSH 200 core balance CTs 1/17assembly 1/17wiring 1/17parallel cables 1/17use <strong>and</strong> connection of CSH 30 interposing ring CT 1/18CSH 30 interposing ring CT 1/18assembly 1/18wiring 1/18connection to CT with 1 A secondary 1/19connection to CT with 5 A secondary 1/19connection to neutral of 3 CTs 1/19selection of operating mode (microswitches) 1/19use <strong>and</strong> connection of ACE 990 interface 1/20connection 1/20characteristics 1/21dimensions 1/21selection of operating mode (microswitches) 1/21assembly 1/21wiring 1/21connection of voltage inputs 1/22connection of 3 VTs 1/22connection of 3 VTs (residual voltage measurement) 1/22connection of 2 VTs 1/23connection of 1 VT 1/23connection of residual voltage input 1/23connection of 2 phase-to-phase voltages (synchro-check function) 1/24connection of 2 phase-to-neutral voltages (synchro-check function) 1/24connection of 3 VTs or 2 VTs in V arrangement (synchro-check function) 1/24connection of Pt100 temperature sensors 1/25connection of sensors in 3-wire mode 1/25connection of sensors in 2-wire mode 1/25wiring 1/25Installation - Use - General characteristics - Testing1/1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!