13.07.2015 Views

Sepam - HV/MV Protection and control units (ENG) - Trinet

Sepam - HV/MV Protection and control units (ENG) - Trinet

Sepam - HV/MV Protection and control units (ENG) - Trinet

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Positive sequence undervoltage <strong>and</strong> phase rotation directioncheck protectionANSI code 27D - 47function n° F38X 1 ≤ X ≤ 2Equipmentc three-phase voltage generatorc voltmetersc chronometerc documentationWiringc diagram B4c protective relays:F381/1, F381/2 for set point 1F382/1, F382/2 for set point 2 (2)F381/3, F382/3 (2) for phase rotation direction checkTestc read the section entitled measurement <strong>and</strong> testingmethodc status parameter settingv select Fn network frequency (50 or 60 Hz)v set Unp network phase-to-phase voltagev set Uns VT secondary circuit phase-to-phasevoltagev set the number of wired VTs to 3UProcedurec set P Seq U/V X protection parametersv inject the 3 rated phase voltages Vnsv set Vsd to the desired value (in kV)v disable the other protection set points, the U U/V x, U U/V <strong>and</strong> N Vol Disp(when sum of VTs is used)Checking of set pontc parameter settingv set T to 0.05 s testv gradually reduce the three voltages at the same time until the relay linked withthe protection picks upv read the Vd value on the pocket terminalv increase the voltages to Vnsv press reset (1) on <strong>Sepam</strong> 2000 to erase the message <strong>and</strong> reset the output relayChecking of time delayc parameter settingv set T to the desired valuec testv wire the chronometer so that it starts when voltage injection stops <strong>and</strong> is stoppedby the output relay linked with the positive sequence undervoltage protectionF38X/2v set the chronometer to zerov cut off the voltage or voltages <strong>and</strong> start the chronometer at the same timev <strong>Sepam</strong>'s 2000 output relay stops the chronometerv read the t value displayed on the chronometerChecking of phase rotation (1)The protection considers that the network connected to <strong>Sepam</strong> 2000 is turning inreverse when the positive sequence voltage is less than 10% Un <strong>and</strong> thephase-to-phase voltages are greater than 80% Un.c inject the rated voltages in inverse order: the rotation message is displayed <strong>and</strong>power readout is disabled.c noteBalanced networkVd = Vn = Un/√3Unbalanced networkLoss of 1 phasev Vd = 0.66 Vn = 0.385 UnTwo phases faultv Vd = 0.5 Vn = 0.288 UnThree phases faultv Vd = 0 VTwo phase to earth faultv Vd = 1/3 Vn = 0.192 Un(1)this function may only be activated if your program logic hasbeen customized.(2)only one protective relay is used in st<strong>and</strong>ard applications(3)remember to reactivate the protections at the end of testing.X = number of the protective relay.1/34<strong>Sepam</strong> 2000 - Testing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!