13.07.2015 Views

Sepam - HV/MV Protection and control units (ENG) - Trinet

Sepam - HV/MV Protection and control units (ENG) - Trinet

Sepam - HV/MV Protection and control units (ENG) - Trinet

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Synchronism checkANSI code 25function n°F171, F181Equipmentc single-phase current generator (1)c voltmeterc documentationWiringc B3, B16 diagramc protective relays:F171/3, F181/3Testc read the section entitled measurement <strong>and</strong> testingmethodc check the SW microswitchesc status parameter setting:v mains frequency (50 or 60 Hz)v Unp, mains phase-to-phase voltage.v Uns, phase-to-phase voltage of the VT secondarycircuitv number of VTs connected.v make the function settings.Proceduretesting of operation with the phase <strong>and</strong> the voltage indicator(a single single-phase voltage generator is required).c apply rated voltage Uns between terminals 4 <strong>and</strong> 5 <strong>and</strong> between terminals2 <strong>and</strong> 1.v use the pocket terminal to measure:phase shift phase dphi = 0°voltages U = Un <strong>and</strong> U' = Unv check that the output associated with the function (F171/3 or F181/3) picks upc apply rated voltage Uns between terminals 4 <strong>and</strong> 5 <strong>and</strong> between terminals2 <strong>and</strong> 1.v use the pocket terminal to measure:phase shift phase dphi = 180°voltages U = Un <strong>and</strong> U' = Unv check that the output associated with the function (F171/3 or F181/3) does notpick upc set the chosen operating mode: mode 1, 2, 3 or 4v apply rated voltage Uns: between terminals 4 <strong>and</strong> 5 which correspond to U orbetween terminals 2 <strong>and</strong> 1 which correspond to U' or no voltage according to thechosen mode.v check that the output associated with the function (F171/3 or F181/3) picks uptesting of operation with frequency <strong>and</strong> voltage(optional test that calls for two single-phase voltage generators)Apply rated voltage Uns to the rated frequency of one of the voltage generatorsbetween terminals 4 <strong>and</strong> 5c apply rated voltage Uns to the other voltage generator between terminals2 <strong>and</strong> 1v at a frequency F = Fn - dFs - 0.02 Hzcheck that the output associated with the function (F171/3 or F181/3)is dropped outv at a frequency F = Fn + dFs + 0.02 Hzcheck that the output associated with the function (F171/3 or F181/3)is dropped outv at a frequency F = Fn - dFs /2check that the output associated with the function (F171/3 ou F181/3) picks up <strong>and</strong>drops out periodicallyv at a frequency F = Fn + dFs/2check that the output associated with the function (F171/3 ou F181/3) picks up <strong>and</strong>drops out periodically.c apply the signal at the rated frequency Fn of the other voltage generator betweenterminals 2 <strong>and</strong> 1v with an amplitude U = Uns - dUs - 5%check that the output associated with the function (F171/3 or F181/3)is dropped outv with an amplitude U = Uns + dUs + 5%check that the output associated with the function (F171/3 or F181/3)is dropped outv with an amplitude U = Uns - dUs/2check that the output associated with the function (F171/3 or F181/3) is picked upv with an amplitude U = Uns + dUs/2check that the output associated with the function (F171/3 or F181/3) is picked up.(1)2 single-phase generators, one with variable frequency, arenecessary for the optional tests1/54<strong>Sepam</strong> 2000 - Testing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!