13.07.2015 Views

Sepam - HV/MV Protection and control units (ENG) - Trinet

Sepam - HV/MV Protection and control units (ENG) - Trinet

Sepam - HV/MV Protection and control units (ENG) - Trinet

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Status menu parameters (cont’d)menu name function 3U +Vo 1 3U + Vo 2Microswitchvoltage boardsettingscurrent boardSW1board 2SW1board 3CT (ECM 1) CSP (ECA) CT (ECM 2)SW2 SW2 SW2put an X in the boxto indicate switchsettinge.g. switch set to rightXSW1 SW1 SW1<strong>Sepam</strong> 2000 substation program logic parametersKP 0 or 1 KP 0 or 1KP1 open/close <strong>control</strong>KP33 choice of type of load sheddingKP2KP4KP17open/close <strong>control</strong>external protection NO/NCdisplay of programmed program logicKP35KP38KPacknowledgment of operating modewith voltage absent for synchro-checkremote setting active / inactive0 or 1 impulseKP18KP19BI pilot wire testreset operation counterKP50inhibition of disturbancerecording recordsKP20reset phase fault tripping counterKP51automatic triggering of disturbance recordingKP52manual triggering of disturbance recordingtime delay (value)T1T2T3T5T6sssssrecovery ofopen/closed data uponchange in device positiondurationof closing orderinhibition of transmit blockinginput after trippingduration of remote <strong>control</strong>tripping impulseduration of remote <strong>control</strong>closing impulsetime delay (value)T7T16extension of dF/dT = 1 (KP33=1)confirmation of pressureswitch faultT8 s maintain output O33for synchro-checkT10 s maintain closing requestfor synchro-checkT24T25T26T27duration of load sheddingpulse (O31)duration of load sheddingpulse (O32)duration of load sheddingpulse (O33)duration of load sheddingpulse (O34)<strong>Sepam</strong> 2000 - Testing3/9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!