10.12.2012 Views

Quartus II Settings File Reference Manual - Altera

Quartus II Settings File Reference Manual - Altera

Quartus II Settings File Reference Manual - Altera

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

16–24 Chapter 16: Advanced I/O Timing Assignments<br />

OUTPUT_IO_TIMING_NEAR_END_VMEAS<br />

OUTPUT_IO_TIMING_NEAR_END_VMEAS<br />

Type<br />

Specifies, in volts, the measurement voltage at the near-end.<br />

String<br />

Device Support<br />

This setting can be used in projects targeting the following device families:<br />

■ Arria <strong>II</strong> GX<br />

■ Arria <strong>II</strong> GZ<br />

■ Arria V<br />

■ Cyclone <strong>II</strong>I<br />

■ Cyclone <strong>II</strong>I LS<br />

■ Cyclone IV E<br />

■ Cyclone IV GX<br />

■ Cyclone V<br />

■ HardCopy <strong>II</strong>I<br />

■ HardCopy IV<br />

■ Stratix <strong>II</strong>I<br />

■ Stratix IV<br />

■ Stratix V<br />

Notes<br />

This assignment supports wildcards.<br />

Syntax<br />

set_instance_assignment -name OUTPUT_IO_TIMING_NEAR_END_VMEAS -to -<br />

entity <br />

set_global_assignment -name OUTPUT_IO_TIMING_NEAR_END_VMEAS -section_id<br />

<br />

set_global_assignment -name OUTPUT_IO_TIMING_NEAR_END_VMEAS <br />

<strong>Quartus</strong> <strong>Settings</strong> <strong>File</strong> June 2012 <strong>Altera</strong> Corporation<br />

<strong>Reference</strong> <strong>Manual</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!