Airport drainage is again an important<br />

consideration. This alternative<br />

considers the potential to pave over<br />

drainage piping with apron space or<br />

roads as necessary. As there may be<br />

times when access to the drainage<br />

piping is necessary, construction <strong>of</strong><br />

hangars on top <strong>of</strong> the piping is not<br />

considered.<br />

Landside Alternative B considers<br />

locating the ATCT on the north end <strong>of</strong><br />

the <strong>airport</strong>. <strong>The</strong> site considered is<br />

currently occupied by a public parking<br />

lot. As necessary, this parking lot can<br />

be expanded to meet the needs <strong>of</strong> tower<br />

employees. This location is further<br />

discussed later in this chapter.<br />

Advantages: <strong>The</strong> <strong>airport</strong> would have<br />

ownership <strong>of</strong> the entire westside flight<br />

line. More land is available for<br />

development. Separation <strong>of</strong> activity<br />

levels is improved.<br />

Disadvantages: <strong>The</strong> <strong>airport</strong> may run<br />

out <strong>of</strong> land available for development in<br />

the distant future. This likely would<br />

not happen within the next 20 years,<br />

but it could sometime thereafter. This<br />

circumstance should be avoided as<br />

experience at other busy reliever<br />

<strong>airport</strong>s has shown.<br />

LANDSIDE ALTERNATIVE C<br />

Landside Alternative C considers a<br />

more unrestricted development plan. It<br />

provides for property acquisition to the<br />

west <strong>of</strong> Airport Boulevard. This area<br />

encompasses approximately 88 acres.<br />

<strong>The</strong> previously discussed 11 acres to the<br />

southwest <strong>of</strong> the runway along the<br />

4-23<br />

flight line is also considered. As<br />

depicted on Exhibit 4K, this allows for<br />

optimal separation <strong>of</strong> activity levels and<br />

it allows for the development <strong>of</strong><br />

commercial/industrial parcels which<br />

would generate revenue in the form <strong>of</strong><br />

land leases for the <strong>airport</strong>.<br />

A main feature <strong>of</strong> this alternative is the<br />

relocation <strong>of</strong> Airport Boulevard and the<br />

creation <strong>of</strong> a grand entrance to the<br />

<strong>airport</strong> that links directly with the<br />

terminal building area. <strong>The</strong> relocation<br />

<strong>of</strong> Airport Boulevard also creates space<br />

for additional aviation-related parcels<br />

with taxiway access, as well as nonaviation<br />

related business development<br />

parcels.<br />

Utilization <strong>of</strong> the land will easily allow<br />

for the separation <strong>of</strong> activity levels. <strong>The</strong><br />

existing executive hangar apron<br />

immediately to the south <strong>of</strong> the<br />

terminal building is continued to the<br />

west, allowing for the development <strong>of</strong><br />

more hangars. To the west <strong>of</strong> the new<br />

south end T-hangars, a T-hangar<br />

complex is developed. Continued<br />

development along the flight line<br />

includes a large apron area fronted by<br />

large FBO/conventional hangars. <strong>The</strong><br />

remaining flight line is considered for<br />

aviation-related hangar development.<br />

This alternative considers locating the<br />

ATCT immediately to the south <strong>of</strong> the<br />

terminal building. This location is<br />

further discussed later in this chapter.<br />

Advantages: This alternative provides<br />

the <strong>airport</strong> with a development plan<br />

that will meet aviation needs well<br />

beyond the 20-year scope <strong>of</strong> this plan.<br />

As revenue-generating commercial/