airport/documents/Mesquite Master Plan Final.pdf - The City of ...
airport/documents/Mesquite Master Plan Final.pdf - The City of ...
airport/documents/Mesquite Master Plan Final.pdf - The City of ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CHAPTER FIVE<br />
AIRPORT PLANS<br />
<strong>The</strong> <strong>airport</strong> master planning process has evolved through<br />
several analytical efforts in the previous chapters. <strong>The</strong>se efforts,<br />
intended to analyze future aviation demand, establish airside<br />
and landside needs and evaluate options for the future<br />
development <strong>of</strong> <strong>Mesquite</strong> Metro Airport and its facilities.<br />
In the previous chapter, several development alternatives were<br />
analyzed to explore different options for the future growth and<br />
development <strong>of</strong> <strong>Mesquite</strong> Metro Airport. <strong>The</strong> development<br />
alternatives have been refined into a single recommended<br />
concept for the master plan after meeting with the <strong>Plan</strong>ning<br />
Advisory Committee (PAC), which provided feedback to the<br />
consultant. This chapter describes, in narrative and graphic<br />
form, the recommended direction for the future use and<br />
development <strong>of</strong> <strong>Mesquite</strong> Metro Airport.<br />
RECOMMENDED CONCEPT<br />
<strong>The</strong> recommended master plan concept incorporates airside<br />
development elements suggested in Airfield Alternative 1,<br />
presented in Chapter Four - Alternatives. Landside develop-<br />
ment closely follows the improvements suggested in Landside<br />
Alternative C. As a result, the recommended concept provides<br />
the <strong>airport</strong> with the ability to meet the increasing demands on<br />
the <strong>airport</strong> by corporate aircraft, while also providing adequate<br />
space for small, general-aviation aircraft operators.<br />
It is important to note that the finalized concept provides for<br />
anticipated facility needs over the next twenty years, as well as<br />
establishing a vision and direction for meeting facility needs beyond<br />
the planning period. <strong>The</strong> <strong>airport</strong> has experienced significant<br />
5-1 DRAFT