include a full-time <strong>airport</strong> manager, an<br />

operations manager, a full-time<br />

administrative assistant, and up to four<br />

maintenance/line operator personnel.<br />

It should be noted that proposed capital<br />

improvements may at times exceed the<br />

<strong>City</strong>’s ability to fund them from general<br />

funds. Thus, debt service (contractual)<br />

obligations will likely continue through<br />

6-15<br />

the long term planning horizon.<br />

Projects which may require bonding and<br />

subsequent debt service expense include<br />

projects associated with the extension <strong>of</strong><br />

Runway 17-35, hangar construction (if<br />

the <strong>City</strong> chooses to construct Thangars),<br />

and infra-structure<br />

improvements to the south terminal<br />

area. Future cash flow analysis is<br />

presented in Table 6C.<br />

TABLE 6C<br />

Projected Operating Revenues and Expenditures (Annual Averages)<br />

<strong>Mesquite</strong> Metro Airport<br />

Item<br />

Operating Revenues<br />

Short Term Intermediate Term Long Term<br />

Hangar Rental $376,790 $472,070 $634,560<br />

Tie-Downs 9,230 9,650 10,200<br />

Fuel Sales 693,490 864,530 1,149,890<br />

Lease Receipts 29,190 36,330 44,860<br />

Other Revenue 23,120 25,280 28,270<br />

Total Operating Revenues<br />

Operating Expenses<br />

$1,131,820 $1,407,860 $1,867,780<br />

Personnel Services $333,750 $381,350 $451,470<br />

Contractual Services 155,710 170,240 190,360<br />

Fuel 515,610 615,490 772,060<br />

Supplies 24,730 26,440 28,740<br />

Transfer Debt Service 126,020 171,020 236,380<br />

Furniture, Fixtures, Equipment 2,030 2,120 2,240<br />

Total Operating Expenses<br />

Net Average Annual Operating<br />

$1,157,850 $1,366,660 $1,681,250<br />

Income/(Loss) ($26,030) $41,200 $186,530<br />

SUMMARY<br />

<strong>The</strong> best means to begin the<br />

implementation <strong>of</strong> the recommendations<br />

in this master plan is to first<br />

recognize that planning is a continuous<br />

process that does not end with<br />

completion and approval <strong>of</strong> this<br />

document. Rather, the ability to<br />

continuously monitor the existing and<br />

forecast status <strong>of</strong> <strong>airport</strong> activity must<br />

be provided and maintained. <strong>The</strong> issues<br />

upon which this master plan is based<br />

will remain valid for a number <strong>of</strong> years.<br />

<strong>The</strong> primary goal is for the <strong>airport</strong> to<br />

evolve into a facility that will best serve<br />

the air transportation needs <strong>of</strong> the<br />

region and become a self-supporting<br />

economic generator for the <strong>City</strong> <strong>of</strong><br />

<strong>Mesquite</strong>.<br />

<strong>The</strong> actual need for facilities is most<br />

appropriately established by <strong>airport</strong><br />

activity levels rather than a specified<br />

date. For example, projections have<br />

been made as to when additional