It is particularly important to record influent quantities<br />

and the quality of BOD-5/P and BOD-5/N ratios as well as<br />

the biological degradability before and after<br />

sedimentation. The COD/BOD5 ratio is also important in<br />

that it has a crucial influence on the dimensions of the<br />

nitrogen-removal equipment.<br />

Our experience in Germany shows that pilot tests to<br />

determine wastewater composition should last at least one<br />

week and include periods of maximum load capacity.<br />

As a further tool for determining the dimensions of sewage<br />

treatment plants with nutrient-removal stages, a computer<br />

program called DENIKA has meanwhile been developed by<br />

German scientists. Using this program, the optimum<br />

dimensions can be determined for each plant based on the<br />

measured pollution load values and the given processes.<br />

Compared with this procedure, the figures calculated only<br />

from the tables are far higher. Pilot plants, therefore,<br />

can greatly reduce investment and running costs.<br />

For large sewage treatment plants, f. ex. for a<br />

population-equivalent of 50,000, the operation of a pilot<br />

plant is recommended. This is especially the case when the<br />

composition of the wastewater is different from that<br />

usually recieved from households. It is only through the<br />

use of pilot plants that optimum processes and tank<br />

construction can be determined. Operating a pilot plant,<br />

however, requires a lot of time and personnel. The test<br />

period usually lasts one year because all operating<br />

conditions are to be recorded. The time and effort<br />

involved in running a large pilot plant certainly pay off<br />

in that there are no surprises later during full-scale<br />

operation and it is known which results can be expected.<br />

In Schleswig-Holstein, four such pilot plants have been in<br />

operation simultaneously over the past few years. The<br />

plants are transportable systems that were specially<br />

designed at universities and then made available to the<br />

town councils and local authorities to carry out the test<br />

205