22.10.2012 Views

Fsnau-Post-Gu-2012-Technical-Report

Fsnau-Post-Gu-2012-Technical-Report

Fsnau-Post-Gu-2012-Technical-Report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendices<br />

106<br />

5.5 pOsT <strong>Gu</strong> ‘12 OVeRALL TiMeLine<br />

Overview of <strong>Gu</strong> ‘12 Assessment Analytical Processes and Timeline<br />

Activity Date Description/Location<br />

FSNAU Partner Planning Meeting June 11<br />

Finalisation of assessment instruments, team composition and<br />

travel and logistical arrangements (Nairobi).<br />

Regional Planning Workshops July 1 - July 10<br />

Fieldwork June 13 - 3 July<br />

Due to problems relating to accessibility, FSNAU is currently unable to conduct regional presentations in Southern and Central<br />

Somalia.<br />

FSNAU <strong>Technical</strong> Series <strong>Report</strong> No. VI 48<br />

Issued October 18, <strong>2012</strong><br />

Regional planning workshops in Garowe<br />

Hargeysa<br />

Due to security, planning workshops could not be conducted<br />

Central-South, however assessment planning meetings were<br />

held in various regions/districts<br />

IDP Representative Household Survey (North)<br />

Urban Representative Household Survey (North)<br />

Crop and livestock assessments throughout the country with<br />

support from partners, enumerators and key informants in the<br />

areas with limited access due to insecurity.<br />

Teams travelled to Hargeysa and Garowe:<br />

Deliverables<br />

• Hard Copies of Assessment Questionnaires<br />

Regional Analysis Meetings July 29 - August 2<br />

•<br />

•<br />

Filled Out Electronic Forms<br />

IPC Evidence Based Templates<br />

• Actual Sample Size Versus Planned (Table)<br />

• Regional Assessment Photos<br />

• Security Risk Analysis (SRA) Table<br />

• Regional <strong>Report</strong> Articles<br />

All Team Analysis Workshop August 6-17 All Team (FSNAU, FAs and Partners), Hargeysa<br />

Vetting of Nutrition Results with<br />

Partners<br />

August 21 FSNAU with Primary <strong>Technical</strong> Partners, Nairobi<br />

Vetting of IPC Results with Partners August 22 FSNAU with Primary <strong>Technical</strong> Partners, Nairobi<br />

Release of Results<br />

<strong>Technical</strong> Release<br />

September 7<br />

FSNAU Press Release<br />

<strong>Post</strong>-<strong>Gu</strong> 2011 Presentation of Findings August 24 Presentation to FSEDC, Nairobi<br />

Northeast (Garowe)<br />

Regional Presentations<br />

August 25-26<br />

Northwest (Hargeysa)<br />

Release of Nutrition <strong>Technical</strong> Series<br />

<strong>Report</strong><br />

Release of Food Security <strong>Technical</strong><br />

Series <strong>Report</strong><br />

September 26 FSNAU website, email distribution and hardcopy mailing<br />

October 18 FSNAU website, email distribution and hardcopy mailing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!